Marathon County, WI Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Disturbing more than one acre
Approval needed
DNR sign-off before earthwork begins
Governs
Unincorporated towns only, not cities
Code chapter
Ch. 18, Land Division and Surveying

Summary

Marathon County requires developers disturbing more than one acre during a land division to prepare a DNR-approved soil erosion control and stormwater management plan before starting earthwork.

City-specific rules exist: Rothschild, and Wausau have their own erosion control rules that differ from Marathon County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

When the developer intends to remove or disturb the natural topsoil, trees, and other vegetation, and/or add impervious surfaces, or where the developer intends to change the surface contour of a proposed subdivision, the developer shall prepare a soil erosion control and stormwater management plan and have such plan approved by the DNR prior to the commencement of earthwork. The soil erosion control and stormwater management plan shall be included in the improvement plan drawings for disturbed areas greater than one acre.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 59).

Full Breakdown

Under the county's Land Division and Surveying Code, any developer who strips topsoil, clears vegetation, adds impervious surface, or reshapes land in a proposed subdivision must prepare a soil erosion control and stormwater management plan and get DNR approval before earthwork starts. Once disturbed land exceeds one acre, the plan must be built into the subdivision's improvement-plan drawings and cover phased construction, minimized clearing, temporary and permanent seeding, and structural erosion and sediment controls. The rule reaches land divisions in the county's unincorporated towns; it does not apply inside Wausau or the county's incorporated cities and villages, which regulate their own subdivisions.

Violations & Fines

The Committee withholds final plat approval and requires plan revisions and additional erosion-potential studies until a project's soil erosion control plan meets DNR standards.

Frequently Asked Questions

Does Marathon County require an erosion control permit for construction?
For subdivisions, yes: once disturbed land tops one acre the developer must get a soil erosion control and stormwater management plan approved by the DNR before earthwork starts (Marathon County Code § 18.006.07(C)).
Does this rule apply inside Wausau or Mosinee?
No. Marathon County's land division code governs unincorporated towns only; Wausau, Mosinee, Rothschild and the county's other cities and villages administer their own subdivision and erosion rules.

Sources & Official References

Other rules in Marathon County

All Marathon County rules

Compare Marathon County to another location·View the Wisconsin environmental rules overview

Get notified when Erosion Control in Marathon County, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Marathon County