Wausau, WI Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing agency
Stormwater Management Administrator
Sediment reduction target
80% of annual runoff load
Inspection trigger
Within 24 hrs of 0.5in rain
Permit duration
180 days, extendable
Penalty
$50-$500 forfeiture per day
Appeal body
Board of Appeals, § 23.82

Summary

Wausau requires an erosion and sediment control permit before any land-disturbing construction, enforced by the city's Stormwater Management Administrator under Marathon County, Wisconsin. Site plans must cut sediment runoff by 80 percent and be inspected weekly until the ground is fully stabilized.

(a)Performance standards.(1)Responsible party. The responsible party shall implement an erosion and sediment control plan, developed in accordance with paragraph (c) that incorporates the requirements of this section.(2)Plan. A written plan shall be developed in accordance with paragraph (c) and implemented for each construction site.(3)Erosion and other pollutant control requirements. The plan required under subsection (2) shall include the following:(A)BMPs that, by design, achieve to the maximum extent practicable, a reduction of 80 percent of the sediment load carried in runoff, on an average annual basis, as compared with no sediment or erosion controls until the construction site has undergone final stabilization. No person shall be required to exceed an 80 percent sediment reduction to meet the requirements of this paragraph. ... (b)Permitting requirements, procedures and fees.(1)Permit required. No responsible party may commence a land disturbing construction activity subject to this ordinance without receiving prior approval of an erosion and sediment control plan for the site and a permit from the Stormwater Management Administrator.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12 Update 2).

Full Breakdown

065 makes it unlawful to begin a land-disturbing construction activity inside the city without first securing an erosion and sediment control permit from the Stormwater Management Administrator, a City of Wausau employee designated by the Director of Public Works and Utilities. 010(a). The Administrator has 15 business days to approve or deny a complete application, or another 15 business days after any requested additional information. Approved designs must cut the average annual sediment load in runoff by 80 percent compared to an uncontrolled site; if that target cannot be met, the plan must explain why in writing and reduce sediment to the maximum extent practicable instead.

5 inches or more, log inspections weekly, and repair any siltation damage to neighboring drainage ways. Permits run 180 days, or as long as the building permit, whichever is longer, and the Administrator can grant one or more 180-day extensions. 82.

Violations & Fines

A responsible party who disturbs land without an approved erosion control plan, or fails to maintain required best management practices, faces a forfeiture of $50 to $500 per offense under § 15.56.130(i), with each day of noncompliance a separate violation. The Stormwater Management Administrator can also post a stop-work order, revoke the permit, or ask the City Attorney to seek a cease-and-desist order or injunction in court.

Frequently Asked Questions

Do I need a permit to grade a lot in Wausau?
Yes. Under § 15.56.065, no responsible party may start a land-disturbing construction activity in the city without an approved erosion and sediment control plan and a permit from the Stormwater Management Administrator, who reviews a complete application within 15 business days.
How much sediment reduction does the plan have to achieve?
The plan must use best management practices that cut the average annual sediment load in runoff by 80 percent compared with an uncontrolled site. If that goal is not achievable, the applicant must submit a written, site-specific explanation and reduce sediment to the maximum extent practicable instead.
How often must the site be inspected during construction?
The responsible party must inspect best management practices within 24 hours of any rainfall of 0.5 inches or more that produces runoff, and at least once every week regardless of rain, logging the date, inspector's name, and construction phase each time.
What happens if a builder ignores an erosion control violation notice?
The Stormwater Management Administrator can post a stop-work order, revoke the permit, and refer the matter to the City Attorney. Courts can impose a forfeiture of $50 to $500 per day of violation and issue an injunction to force compliance.

Sources & Official References

Other rules in Wausau

All Wausau rules

Compare Wausau to another location·View the Wisconsin environmental rules overview

Get notified when Erosion Control in Wausau, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Marathon County handle erosion control.

Rothschild, WI
Some Restrictions