San Jose, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Any excavation or fill
Small-project relief
Notice of exemption available
Application must include
Soil + geology reports
Engineering grading threshold
5,000 cubic yards
Unspecified-term permit lasts
Six months

Summary

San Jose requires a grading permit or a director-approved notice of exemption before any excavation or fill work, per Municipal Code § 17.04.310 and § 17.04.340, administered by the Department of Public Works.

A. Permits required. No person shall do any grading without first obtaining a grading permit or a notice of exemption pursuant to Section 17.04.310 from the director. A separate permit shall be required for each site and may cover both excavations and fills.

Source: San Jose Municipal Code Ch. 17.04 - GradingView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 5 Update 3).

Full Breakdown

Anyone doing grading in San Jose, excavation, fill, or both, must first get a grading permit from the Director of Public Works or a notice of exemption under § 17.04.310. The application must include plans, specifications, and (unless waived by the director) a soil engineering and engineering geology report under § 17.04.340(C)-(F). The director checks the application against the Municipal Code and other applicable laws, and must approve or deny it in writing within forty days. Projects moving more than 5,000 cubic yards count as "engineering grading" and face closer geologic review; small jobs, cuts under two feet, fills under three feet, total earthwork under 150 cubic yards, may qualify for the exemption instead, unless the site sits in a special geologic hazard area.

Violations & Fines

The director can suspend or revoke a grading permit for work done in error, based on false information, or that creates a hazard, under § 17.04.340(O). Grading without a permit or exemption is a code violation enforceable under Chapter 1.08.

Frequently Asked Questions

Do I need a permit for a small grading job in San Jose?
Small jobs can get a notice of exemption instead of a permit under § 17.04.310, for example, cuts under two feet, fills under three feet, and total earthwork under 150 cubic yards, unless the site is in a special geologic hazard area.
What has to be submitted with a San Jose grading permit application?
Plans and specifications plus a soil engineering and engineering geology report, per § 17.04.340(C)-(F), unless the director waives the reports.
Can San Jose revoke a grading permit after it's issued?
Yes, § 17.04.340(O) lets the director suspend or revoke a permit issued in error, based on incorrect information, or where the work creates a hazard or violates the Code.

Sources & Official References

Other rules in San Jose

All San Jose rules

California rules heatmap·Compare San Jose to another location·View the California environmental rules overview

Get notified when Erosion Control in San Jose, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Santa Clara County handle erosion control.

Sunnyvale, CA
Some Restrictions
Santa Clara, CA
Some Restrictions
Mountain View, CA
Some Restrictions