Whitfield County, GA Environmental Rules: Erosion Control (2026)
Key Facts
- Permit required
- Before any land-disturbing activity (Sec. 5-74)
- Issuing office
- County engineer's erosion/stormwater office
- Plan review
- Limestone Valley Soil and Water Conservation District
- Default stream buffer
- 25 ft; 50 ft for trout streams
- Possible bond
- Up to $3,000 per acre
- Civil penalty
- Up to $2,500.00 per day (Sec. 5-76)
Summary
Whitfield County's Soil Erosion, Sedimentation and Pollution Control Ordinance bars land-disturbing activity in the unincorporated county without a permit from the county engineer's erosion/stormwater inspections office. Applicants must submit an approved erosion, sedimentation and pollution control plan, and the county can fine violators up to $2,500.00 per day.
(1)No person shall conduct any land-disturbing activity within the jurisdictional boundaries of Whitfield County without first obtaining a permit from the county engineer (erosion/stormwater inspections) office to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.
Full Breakdown
Article IV of Chapter 5, the Whitfield County Soil Erosion, Sedimentation and Pollution Control Ordinance (Sec. 5-70), covers land-disturbing activity countywide with exemptions for things like home gardens, agricultural operations, and single-family construction disturbing less than one acre outside a larger common development (Sec. 5-72). Sec. 5-74(b)(1) states that no person shall conduct any land-disturbing activity within the jurisdictional boundaries of Whitfield County without first obtaining a permit from the county engineer's erosion/stormwater inspections office, along with a copy of any notice of intent filed with the state Environmental Protection Division where required.
The application must include an erosion, sedimentation and pollution control plan, in three copies, demonstrating compliance with the minimum best-management-practice requirements of Sec. 5-73, which set a default 25-foot vegetated buffer along the banks of state waters and a 50-foot buffer along trout streams. 00 per acre of disturbance before issuing it (Sec. 5-74). 00 per acre of land-disturbing activity apply and are split with the state Environmental Protection Division where the county is a certified local issuing authority (Sec. 5-74(b)(3)). The Whitfield County certified inspector periodically inspects permitted sites and issues written notices to comply when work strays from the approved plan (Sec. 5-75).
Violations & Fines
Starting land-disturbing work without the required permit exposes the violator to revocation of any related business license or work permit under Sec. 5-76(a). For a first or second violation the county issues a written warning with five days to correct it before a stop-work order follows; a third violation, or any violation posing an imminent threat, draws an immediate stop-work order, and monetary penalties reach $2,500.00 per day per violation.
Frequently Asked Questions
Do I need a permit to grade or clear land in unincorporated Whitfield County?
Is building a single-family home always exempt from the erosion ordinance?
How wide is the required stream buffer?
What can happen if I disturb land without a permit?
Sources & Official References
Other rules in Whitfield County
Compare Whitfield County to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.