Craven County, NC Environmental Rules: Flood Elevation Requirements (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Elevation rule
Craven County Code § 18-41(1)
Freeboard added to BFE
2 feet (§ 18-5)
No BFE established
2 feet above highest adjacent grade
Applies to
Residential structures incl. manufactured homes
Proof required
FEMA elevation certificate, Form 086-0-33

Summary

Craven County Code § 18-41 requires the reference level of every new or substantially improved residential structure in a special flood hazard area, including manufactured homes, to be elevated no lower than the regulatory flood protection elevation, which § 18-5 fixes at the base flood elevation plus a mandatory two feet of freeboard.

These county ordinances apply to unincorporated areas of Craven County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Freeboard means the height added to the BFE to account for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, blockage of bridge or culvert openings, storm surge or precipitation exceeding the base flood, and the hydrological effect of urbanization of the watershed. The BFE plus the freeboard establishes the "regulatory flood protection elevation". ... Regulatory flood protection elevation means the base flood elevation plus the freeboard. In special flood hazard areas where base flood elevations (BFEs) have been determined, this elevation shall be the BFE plus two feet of freeboard. In special flood hazard areas where no BFE has been established, this elevation shall be at least two feet above the highest adjacent grade. ... (1)Residential construction. New construction or substantial improvement of any residential structure (including manufactured homes) shall have the reference level, including basement, elevated no lower than the regulatory flood protection elevation.

Full Breakdown

Section 18-5 defines freeboard as the height added to the base flood elevation (BFE) to cover unknown factors, wave action, bridge or culvert blockage, storm surge, or urbanization effects, that can push actual flood heights above the calculated base flood. The same section defines regulatory flood protection elevation (RFPE) as the BFE plus that freeboard: where a BFE has been determined for a special flood hazard area, the RFPE is the BFE plus two feet of freeboard; where no BFE has been established, the RFPE is at least two feet above the highest adjacent grade.

Section 18-41(1) then applies that standard directly to housing: new construction or substantial improvement of any residential structure, including manufactured homes, must have its reference level, including any basement, elevated no lower than the regulatory flood protection elevation. Section 18-41(2) extends a comparable rule to nonresidential structures, which may floodproof to the RFPE instead of elevating, provided a registered professional engineer or architect certifies the floodproofing meets the chapter's watertight and structural-load standards. Manufactured homes get their own anchoring detail in § 18-41(3): homes elevated 36 inches or less above grade need reinforced piers or equivalent foundation elements, while homes elevated above 36 inches require an engineered foundation certification.

Applicants prove compliance with a preliminary elevation certificate before construction starts and a final as-built elevation certificate, both on FEMA Form 086-0-33, submitted to the floodplain administrator under § 18-26(3) before a certificate of occupancy issues.

Violations & Fines

Constructing or substantially improving a residential structure in a special flood hazard area with its reference level below the regulatory flood protection elevation violates § 18-41(1). Failing to submit the required preliminary or final as-built elevation certificate to the floodplain administrator under § 18-26(3), or failing to correct a deficiency the administrator identifies, is grounds to deny the floodplain development permit or withhold the certificate of occupancy, on top of the Chapter 18 penalty at § 18-13.

Frequently Asked Questions

How high above the base flood elevation must a house be built in Craven County?
Craven County Code § 18-5 defines the regulatory flood protection elevation as the base flood elevation plus two feet of freeboard, and § 18-41(1) requires new or substantially improved residential structures to have their reference level at or above that elevation.
Does the freeboard requirement apply to manufactured homes too?
Yes. Section 18-41(1) expressly includes manufactured homes among the residential structures that must have their reference level elevated no lower than the regulatory flood protection elevation.
What if there's no base flood elevation established for my lot?
Section 18-5 sets the regulatory flood protection elevation at a minimum of two feet above the highest adjacent grade in special flood hazard areas where no base flood elevation has been determined.
How do I prove my structure meets the elevation requirement?
Section 18-26(3) requires a preliminary elevation certificate before construction starts and a final as-built elevation certificate afterward, both on FEMA Form 086-0-33, submitted to the floodplain administrator before occupancy is certified.

Sources & Official References

Other rules in Craven County

All Craven County rules

Compare Craven County to another location·View the North Carolina environmental rules overview

Get notified when Flood Elevation Requirements in Craven County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.