Hanover County, VA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard required
- Base flood elevation plus 1 foot
- Applies to
- New construction & substantial improvements
- Nonresidential option
- Floodproofing instead of elevation
- Accessory structure cap
- 600 sq ft if not elevated
- Utility equipment
- Must sit at/above BFE plus 1 ft
Summary
New construction and substantial improvements in Hanover County's AE and A flood zones must have the lowest floor, including any basement, elevated to at least one foot above the base flood elevation, in Hanover County outside the Town of Ashland. Section 26-235.19 applies the same one-foot freeboard to both residential and nonresidential buildings.
a.Residential construction. New construction or substantial improvement of any residential structure (including manufactured homes) in Zones AE and A with detailed base flood elevations shall have the lowest floor, including basement, elevated to or above the base flood level plus one (1) foot. ... b.Nonresidential construction. New construction or substantial improvement of any commercial, industrial or nonresidential building (or manufactured home) shall have the lowest floor, including basement, elevated to or above the base flood level plus one (1) foot.
Full Breakdown
15(3). For residential construction, including manufactured homes, in Zones AE and A with detailed base flood elevations, the lowest floor, including any basement, must be elevated to or above the base flood level plus one foot; the same one-foot freeboard applies to recreational amenities such as tennis courts, sports fields and playgrounds built as part of a residential development. 19(b) lets an owner floodproof instead of elevate, provided every component below the BFE-plus-one-foot line is watertight and can resist hydrostatic and hydrodynamic loads, certified by a registered engineer or architect.
Fully enclosed space below the lowest floor may only be used for parking, building access or limited storage, must be built of flood-resistant materials, and must carry flood openings sized at one square inch of net opening for every square foot of enclosed area. Accessory structures get the same elevation rule or, if left unelevated, are capped at six hundred square feet, limited to parking or storage, and must have flood openings meeting the same criteria. 18 layers on an additional requirement that utility, electrical, heating and plumbing equipment sit at or above that same BFE-plus-one-foot line.
Violations & Fines
Building below the required base flood elevation is enforced as a zoning violation. Section 26-347 requires a written notice of violation before civil penalties apply, and Section 26-348 sets a two hundred dollar penalty for the first summons and five hundred dollars for each later one, capped at five thousand dollars. Exceeding that cap makes it a misdemeanor under Section 26-349, fined ten to one thousand dollars, and an under-elevated structure also risks higher federal flood insurance premiums.
Frequently Asked Questions
How high above the flood level must I build in Hanover County?
Can a commercial building be floodproofed instead of elevated?
How big can an unelevated shed be in the flood hazard overlay?
Sources & Official References
Other rules in Hanover County
Compare Hanover County to another location·View the Virginia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.