Key Facts

Minimum freeboard
1 foot above base flood elevation
Applies to
New construction & substantial improvements in SFHA
Non-residential alternative
Dry floodproofing to same 1-ft elevation
Floodproofing certifier
Alabama-licensed engineer or architect
Permit required
Floodplain Development Permit before construction
Violation classification
Misdemeanor under Title 11, Ch. 19 & 45

Summary

In Madison County's unincorporated area, new construction and substantial improvements in a Special Flood Hazard Area must have the lowest floor built at least one foot above the base flood elevation. The Floodplain Administrator enforces the rule under the county's Flood Damage Prevention Ordinance.

City-specific rules exist: Huntsville has its own flood elevation requirements rules that differ from Madison County's county-level regulations. If you live in Huntsville, check the city-specific page instead.

Residential and Non-Residential Structures - Where BFE data is available, new construction and substantial improvement to any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one (1) foot above the base flood elevation (also referred to as the design flood elevation). Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of Article 4, Section B(3).

Full Breakdown

Article 4, Section B(1) of the Madison County Flood Damage Prevention Ordinance sets the county's freeboard standard: where base flood elevation (BFE) data is available, new construction and substantial improvement to any structure or manufactured home in an A, AE, or AH zone must have the lowest floor, including the basement, elevated no lower than one foot above the base flood elevation, called the design flood elevation. If solid perimeter walls are used to elevate the structure instead of open piers, the walls must include openings sized to let flood waters move through unimpeded, per the standards in Article 4, Section B(3).

Non-residential structures get an alternative under Section B(2): instead of elevating, they may be dry floodproofed to the same one-foot-above-BFE design flood elevation, with walls substantially impermeable to water and structural components able to resist hydrostatic and hydrodynamic loads and buoyancy. Floodproofing must be certified by an Alabama-licensed professional engineer or registered architect against ASCE 24 standards, with the certified elevation kept in the permitting record in perpetuity. A Floodplain Development Permit is required before any such construction begins, administered by the county's Floodplain Administrator.

Manufactured homes must also be elevated and anchored against flotation, collapse, or lateral movement, using methods such as over-the-top or frame ties to ground anchors, in addition to state and local wind-resistance requirements. Where a structure sits in a zone with multiple BFEs, it must meet the standard for the most hazardous zone and highest BFE on the site.

Violations & Fines

Violating the ordinance, including any freeboard or floodproofing requirement or a condition attached to a variance, is a misdemeanor under authority the state grants local governments in Code of Alabama (1975), Title 11, Chapters 19 and 45. The county may issue a stop work order requiring all work on the building or premises to cease immediately, and can issue a written Notice of Violation by certified mail describing the violation, the required remedial measures, and any penalty, with a right to appeal the determination by filing a written Notice of Appeal.

Frequently Asked Questions

How high above base flood elevation must a home be built in unincorporated Madison County?
At least one foot above the base flood elevation, measured to the lowest floor including the basement, under Article 4, Section B(1) of the county's Flood Damage Prevention Ordinance. This applies to new construction and substantial improvements wherever BFE data is available.
Can a commercial building be floodproofed instead of elevated?
Yes. Article 4, Section B(2) lets non-residential structures in AE or AH zones use dry floodproofing to the same one-foot-above-BFE design flood elevation instead of raising the structure, but the design must be certified by an Alabama-licensed engineer or architect against ASCE 24 standards.
What happens if construction doesn't meet the freeboard requirement?
It is a misdemeanor under the ordinance, and the county's Floodplain Administrator can issue a stop work order and a written Notice of Violation by certified mail, which can be appealed by filing a written Notice of Appeal.

Sources & Official References

Other rules in Madison County

All Madison County rules

Compare Madison County to another location·View the Alabama environmental rules overview

Get notified when Flood Elevation Requirements in Madison County, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Cities Across Madison County