Skip to main content
CityRuleLookup

Huntsville, AL Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard required
1 foot above BFE
Applies to
Floodway fringe, zones AE/AH
Permit required
Floodplain development permit
Enforcing office
City Engineer / Manager of Inspection

Summary

New or substantially improved buildings in Huntsville's floodway fringe must have their lowest floor built at least one foot above the base flood elevation, per the city's flood hazard district regulations.

New construction or substantial improvement of any residential structure shall have the lowest floor, including basement and garage, elevated to at least one foot above the base flood elevation. When solid foundation perimeter walls are used to elevate a structure, openings sufficient to facilitate the unimpeded movement of floodwater shall be provided in accordance with the standards of section 62.7.3 and must be certified as such to the manager of inspection by a registered engineer or architect.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 2).

Full Breakdown

Huntsville's flood hazard district regulations (Zoning Ordinance Appendix A, Article 62) require new construction or substantial improvement of a residential structure in the floodway fringe (zones AE or AH) to have its lowest floor, including basement and garage, elevated at least one foot above the base flood elevation. Nonresidential structures must meet the same one-foot freeboard or be floodproofed to that level and certified by a registered engineer or architect. A floodplain development permit from the city engineer is required before any land-disturbing or building activity in the flood hazard district.

Violations & Fines

Working in the floodway or floodway fringe without a floodplain development permit is a misdemeanor; on conviction the offender is fined under Sec. 91.6 (general penalty).

Frequently Asked Questions

How high above base flood elevation must a new home's floor be in Huntsville?
At least one foot above the base flood elevation, per Article 62 of the Zoning Ordinance's flood hazard district regulations.
Do commercial buildings get the same elevation rule?
Yes: nonresidential structures must be elevated one foot above base flood elevation or floodproofed to that level and engineer-certified.

Sources & Official References

Other rules in Huntsville

All Huntsville rules

Compare Huntsville to another location·View the Alabama environmental rules overview

Get notified when Flood Elevation Requirements in Huntsville, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.