Pocatello, ID Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard above BFE
- 2 feet (where BFE established)
- Elevation with no BFE
- 2 feet above highest adjacent grade
- Non-residential alternative
- engineer-certified floodproofing to FPE
- Enforcing official
- Floodplain Administrator, Planning and Development Services
- Corrective order window
- 60 to 180 days to remedy
- Appeal body
- Construction Board of Appeals, 10 days
- General penalty
- up to $1,000 fine or 6 months jail
Summary
In the City of Pocatello, new construction and substantial improvements in special flood hazard areas must have the lowest floor elevated to the flood protection elevation: base flood elevation (BFE) plus two feet of freeboard. Where no BFE is set, the floor must sit at least two feet above the highest adjacent grade.
FLOOD The base flood elevation plus the freeboard. PROTECTION A. In special flood hazard areas where base flood elevations (BFEs) have been ELEVATION determined, this elevation shall be the BFE plus two feet (2') of freeboard; and (FPE): B. In special flood hazard areas where no BFE has been established, this elevation shall be at least two feet (2') above the highest adjacent grade. ... A. Residential Construction: New construction, substantial improvements, and development of any residential structure (including manufactured homes) shall have the lowest floor, including basement, elevated no lower than the flood protection elevation, as defined in section 15.32.050 of this chapter.
Full Breakdown
Pocatello City Code chapter 15.32, the Flood Damage Prevention Ordinance, defines flood protection elevation (FPE) in section 15.32.050 as the base flood elevation plus two feet of freeboard, or, where no BFE has been determined, at least two feet above the highest adjacent grade. Section 15.32.120 applies that standard: new construction, substantial improvements, and development of any residential structure, including manufactured homes, must have the lowest floor, including any basement, elevated no lower than the FPE. Non-residential structures face the same elevation floor, but Zones A, AE, AH, and AO allow floodproofing to the FPE instead, provided all areas below FPE are watertight with walls substantially impermeable to water and components able to resist hydrostatic and hydrodynamic loads; a registered professional engineer or architect must certify the floodproofing to the Floodplain Administrator under section 15.32.080C.
New and replacement manufactured homes must have their lowest floor no lower than the FPE, be anchored to resist flotation and lateral movement, and if the chassis elevation exceeds thirty six inches above grade, an engineering certification is required. Additions to pre-FIRM structures that qualify as substantial improvements, together with the existing structure, must meet new-construction standards; the same forty nine percent cumulative-cost-over-five-years test under section 15.32.120D.4 triggers full compliance for repairs and remodels. The Floodplain Administrator, appointed under 15.32.050, reviews applications for the Floodplain Development Permit required by section 15.32.080 before any development begins in a special flood hazard area, checking BFE, flood zone designation, and floodway boundaries on the FIRM.
Violations & Fines
Building without the required Floodplain Development Permit, or building below the flood protection elevation, is a violation the Floodplain Administrator must first order corrected under section 15.32.090: written notice, a hearing within ten days, and if violation is confirmed, a written corrective order giving the owner sixty to one hundred eighty days to remedy the condition. Owners may appeal to the Construction Board of Appeals within ten days of the order; an unappealed order becomes final. Failure to comply with a final corrective order, or with the Board's decision on appeal, is a misdemeanor punished at the court's discretion. Under the citywide penalty clause, section 1.04.040, any ordinance violation is a misdemeanor punishable by a fine of up to one thousand dollars, up to six months in the county jail, or both, with each day of continuing violation a separate offense.
Frequently Asked Questions
How high above the base flood elevation must a Pocatello home be built?
Can a commercial building in Pocatello floodproof instead of elevating?
What happens if a Pocatello property owner ignores a flood-elevation violation order?
Does a manufactured home in a Pocatello flood zone need special anchoring?
Sources & Official References
Other rules in Pocatello
Compare Pocatello to another location·View the Idaho environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.