Skip to main content
CityRuleLookup

Pocatello, ID Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard above BFE
2 feet (where BFE established)
Elevation with no BFE
2 feet above highest adjacent grade
Non-residential alternative
engineer-certified floodproofing to FPE
Enforcing official
Floodplain Administrator, Planning and Development Services
Corrective order window
60 to 180 days to remedy
Appeal body
Construction Board of Appeals, 10 days
General penalty
up to $1,000 fine or 6 months jail

Summary

In the City of Pocatello, new construction and substantial improvements in special flood hazard areas must have the lowest floor elevated to the flood protection elevation: base flood elevation (BFE) plus two feet of freeboard. Where no BFE is set, the floor must sit at least two feet above the highest adjacent grade.

FLOOD The base flood elevation plus the freeboard. PROTECTION A. In special flood hazard areas where base flood elevations (BFEs) have been ELEVATION determined, this elevation shall be the BFE plus two feet (2') of freeboard; and (FPE): B. In special flood hazard areas where no BFE has been established, this elevation shall be at least two feet (2') above the highest adjacent grade. ... A. Residential Construction: New construction, substantial improvements, and development of any residential structure (including manufactured homes) shall have the lowest floor, including basement, elevated no lower than the flood protection elevation, as defined in section 15.32.050 of this chapter.

Full Breakdown

Pocatello City Code chapter 15.32, the Flood Damage Prevention Ordinance, defines flood protection elevation (FPE) in section 15.32.050 as the base flood elevation plus two feet of freeboard, or, where no BFE has been determined, at least two feet above the highest adjacent grade. Section 15.32.120 applies that standard: new construction, substantial improvements, and development of any residential structure, including manufactured homes, must have the lowest floor, including any basement, elevated no lower than the FPE. Non-residential structures face the same elevation floor, but Zones A, AE, AH, and AO allow floodproofing to the FPE instead, provided all areas below FPE are watertight with walls substantially impermeable to water and components able to resist hydrostatic and hydrodynamic loads; a registered professional engineer or architect must certify the floodproofing to the Floodplain Administrator under section 15.32.080C.

New and replacement manufactured homes must have their lowest floor no lower than the FPE, be anchored to resist flotation and lateral movement, and if the chassis elevation exceeds thirty six inches above grade, an engineering certification is required. Additions to pre-FIRM structures that qualify as substantial improvements, together with the existing structure, must meet new-construction standards; the same forty nine percent cumulative-cost-over-five-years test under section 15.32.120D.4 triggers full compliance for repairs and remodels. The Floodplain Administrator, appointed under 15.32.050, reviews applications for the Floodplain Development Permit required by section 15.32.080 before any development begins in a special flood hazard area, checking BFE, flood zone designation, and floodway boundaries on the FIRM.

Violations & Fines

Building without the required Floodplain Development Permit, or building below the flood protection elevation, is a violation the Floodplain Administrator must first order corrected under section 15.32.090: written notice, a hearing within ten days, and if violation is confirmed, a written corrective order giving the owner sixty to one hundred eighty days to remedy the condition. Owners may appeal to the Construction Board of Appeals within ten days of the order; an unappealed order becomes final. Failure to comply with a final corrective order, or with the Board's decision on appeal, is a misdemeanor punished at the court's discretion. Under the citywide penalty clause, section 1.04.040, any ordinance violation is a misdemeanor punishable by a fine of up to one thousand dollars, up to six months in the county jail, or both, with each day of continuing violation a separate offense.

Frequently Asked Questions

How high above the base flood elevation must a Pocatello home be built?
Pocatello City Code section 15.32.120 requires the lowest floor, including any basement, of new residential construction or substantial improvements to sit no lower than the flood protection elevation defined in section 15.32.050: the base flood elevation plus two feet of freeboard. If no BFE has been set for the site, the floor must be at least two feet above the highest adjacent grade instead.
Can a commercial building in Pocatello floodproof instead of elevating?
Yes, in Zones A, AE, AH, and AO. Section 15.32.120B lets non-residential structures be floodproofed to the flood protection elevation instead of physically elevated, but every area below that elevation must be watertight with walls that resist water passage and hydrostatic and hydrodynamic loads, certified by a licensed engineer or architect to the Floodplain Administrator.
What happens if a Pocatello property owner ignores a flood-elevation violation order?
Under section 15.32.090, the owner gets written notice, a hearing within ten days, and if the violation is confirmed, sixty to one hundred eighty days to fix it, with an appeal right to the Construction Board of Appeals. Failing to comply with a final order is a misdemeanor, punished at the court's discretion, on top of the citywide penalty in section 1.04.040 of up to a $1,000 fine or six months in jail.
Does a manufactured home in a Pocatello flood zone need special anchoring?
Yes. Section 15.32.120C requires new and replacement manufactured homes to have their lowest floor no lower than the flood protection elevation and to be securely anchored against flotation, collapse, and lateral movement. If the chassis elevation needed to meet that height exceeds thirty six inches above grade, an engineer must certify the foundation.

Sources & Official References

Other rules in Pocatello

All Pocatello rules

Compare Pocatello to another location·View the Idaho environmental rules overview

Get notified when Flood Elevation Requirements in Pocatello, ID changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.