Pocatello, ID Environmental Rules: Stormwater Management (2026)
Key Facts
- Applies to
- All new development/redevelopment and grading permits
- Design standard
- Portneuf Valley Stormwater Design Manual (PVSDM)
- Drainage easement
- Minimum 20 feet wide, sized for 100-yr/24-hr storm
- O&M requirement
- Agreement recorded with Bannock County
- Enforcement steps
- Correction notice, then stop work order
- Criminal penalty
- Misdemeanor, up to $1,000 fine or 6 months jail
Summary
Pocatello's stormwater chapter applies to every new development or redevelopment site in the city, covering grading permits, building permits, site plans, and land divisions under Section 8.52.040. Stormwater facilities must be designed to the Portneuf Valley Stormwater Design Manual under Section 8.52.050, and required drainage easements must be at least twenty feet wide under Section 8.52.100.
8.52.020: PURPOSE: The purpose of this chapter is to: ... A. Provide for the health, safety, and welfare of the citizens of Pocatello by establishing minimum stormwater management requirements consistent with local, federal and state law and the requirements of the city's national pollutant discharge elimination system (NPDES) permit. ... 8.52.040: ... APPLICABILITY: This chapter is applicable to all land development, including, but not limited to, applications for grading and building permits, site plan applications, and land division applications, unless exempt. ... 8.52.050: ... STORMWATER MANUAL: Stormwater management practices shall be designed, constructed, and maintained in accordance with the design and sizing criteria in the "Portneuf Valley Stormwater Design Manual" (PVSDM), as adopted, and as may be amended from time to time. ... 8.52.100: ... DRAINAGE EASEMENTS: ... D. Easements shall be of a width for construction, or maintenance, or both, as will be adequate for the purpose. Width must be able to convey the 100-year, 24-hour storm and shall be no less than twenty feet (20') wide.
Full Breakdown
Chapter 8.52, Stormwater Management, exists to meet the city's NPDES permit obligations, protect water quality in local watercourses, wetlands, and groundwater, and encourage groundwater recharge under Section 8.52.020. Section 8.52.040 applies the chapter to all land development, including grading and building permit applications, site plan applications, and land division applications, unless specifically exempt, and reaches both new development and redevelopment sites. Section 8.52.050 requires stormwater management practices to be designed, constructed, and maintained under the design and sizing criteria in the Portneuf Valley Stormwater Design Manual, as amended.
Where a development is traversed by a drainageway, channel, or stream, Section 8.52.100 requires a recorded drainage easement that conforms to the watercourse, stays clear of fences and other obstructions, and is wide enough to convey a 100-year, 24-hour storm, with a twenty foot minimum width; the easement must be approved by the city and recorded with Bannock County before a final plat or certificate of occupancy issues. Section 8.52.120 makes property owners responsible for operating and maintaining their stormwater facilities and requires an operations and maintenance agreement, recorded with Bannock County, before final development approval when structural or nonstructural stormwater measures are involved.
Section 8.52.110 requires the property owner to notify the city when construction starts so the public works director or a designee can conduct and document regular inspections, and no additional work may proceed past a documented violation until it is corrected and approved. Section 8.52.130 lets the public works director issue a written correction notice describing the required remedial measures and a compliance schedule, backed by a stop work order halting construction until compliance is confirmed.
Violations & Fines
Violating Chapter 8.52 or failing to comply with any of its requirements is a misdemeanor under Section 8.52.140, punishable by a fine up to one thousand dollars, up to six months in the county jail, or both, with each day of violation a separate offense. Section 8.52.150 also lets the city declare the violation a public nuisance, summarily abate or restore the site, and bill the owner for the cost of abatement and restoration.
Frequently Asked Questions
Does the stormwater chapter apply to my home remodel?
What design standard do stormwater facilities have to meet?
How wide does a drainage easement have to be?
Who is responsible for maintaining a stormwater facility after construction?
Sources & Official References
Other rules in Pocatello
Compare Pocatello to another location·View the Idaho environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.