Pueblo, CO Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard required
- 1 foot above BFE
- Applies to
- residential, nonresidential, manufactured homes
- Certification by
- Colorado PE, architect, or surveyor
- Administered by
- Floodplain Administrator
Summary
Pueblo requires new and substantially improved buildings in flood zones to sit at least 1 foot above base flood elevation.
Residential construction. New construction and Substantial Improvement of any residential structure shall have the lowest floor (including basement), elevated to one (1) foot above the base flood elevation. Upon completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered Colorado Professional Engineer, architect or land surveyor. Such certification shall be submitted to the Floodplain Administrator.(2)Nonresidential construction. With the exception of Critical Facilities, outlined in Subsection (h) of this Section, new construction and Substantial Improvements of any commercial, industrial or other nonresidential structure shall either have the lowest floor (including basement) elevated to one (1) foot above the base flood elevation or, together with attendant utility and sanitary facilities, be designed so that at one (1) foot above the base flood elevation the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 109).
Full Breakdown
Pueblo Municipal Code § 17-9-5(b) requires new construction and substantially improved residential structures to have their lowest floor, including basement, elevated to one foot above the base flood elevation, certified by a registered Colorado professional engineer, architect, or land surveyor. Nonresidential structures must meet the same one-foot freeboard or be floodproofed watertight to that elevation. Manufactured homes in mapped flood zones must also be elevated so their lowest floor sits one foot above base flood elevation.
Violations & Fines
Building below the required elevation without certification is a Code violation punished under Pueblo Municipal Code § 1-2-1; noncompliant structures can affect flood insurance eligibility and cost.
Frequently Asked Questions
How high above the base flood elevation must a new home be built in Pueblo?
Does the freeboard rule apply to commercial buildings too?
Sources & Official References
Other rules in Pueblo
Compare Pueblo to another location·View the Colorado environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.