Revere, MA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Subdivision trigger
- More than 50 lots or 5 acres, whichever is less
- Unmapped A Zones
- Building dept. must use best available BFE data
- AO/AH zones
- Adequate drainage paths required around structures on slopes
- FEMA notice
- City must notify FEMA within six months of new data
- Elevation standard source
- Set by 780 CMR, not local ordinance
Summary
Revere does not set its own freeboard number: the actual elevation standard for new construction comes from the state building code. Locally, Section 17.46.050 requires city staff to use the best available data to require elevating structures to or above base flood level, and Section 17.46.080 forces large subdivisions to submit base flood elevation studies.
In A Zones, in the absence of FEMA BFE data and floodway data, the building department will obtain, review and reasonably utilize base flood elevation and floodway data available from federal, state, or other source as criteria for requiring new construction, substantial improvements, or other development in Zone A and as the basis for elevating residential structures to or above base flood level, for floodproofing or elevating nonresidential structures to or above base flood level, and for prohibiting encroachments in floodways. ... When proposing subdivisions or other developments greater than 50 lots or five acres (whichever is less), the proponent must provide technical data to determine base flood elevations for each developable parcel shown on the design plans.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4804778; v14 updated 2026-05-04).
Full Breakdown
Chapter 17.46 (Floodplain District Regulations) leaves the actual construction elevation standard to the Massachusetts State Building Code, 780 CMR, which the City cannot amend, but two sections of the local ordinance still shape how base flood elevation is determined and applied within the Floodplain Overlay District. Section 17.46.050 covers unnumbered A Zones, the areas where FEMA has not published a base flood elevation: there the building department must obtain, review and reasonably use the best available base flood elevation and floodway data from federal, state or other sources as the basis for requiring new construction, substantial improvements or other development in Zone A, for elevating residential structures to or above base flood level, for floodproofing or elevating nonresidential structures to or above base flood level, and for prohibiting floodway encroachments. Section 17.46.060 adds that, in Zones AO and AH, adequate drainage paths must be provided around structures on slopes to route floodwaters away from them.
For larger projects, Section 17.46.080 requires that when a proponent proposes a subdivision or other development of more than fifty lots or five acres, whichever is less, the proponent must supply technical data establishing the base flood elevation for every developable parcel shown on the design plans. If new data changes a mapped base flood elevation, Section 17.46.120 requires the City to notify FEMA within six months and to route that notification through the Massachusetts Department of Conservation and Recreation and the FEMA Region 1 office in Boston. Together, these sections make sure elevation figures used to review Revere projects come from documented sources rather than guesswork, even though the numeric freeboard itself is set by the state code, not city ordinance.
Violations & Fines
Chapter 17.46 does not list a stand-alone penalty for missing base flood elevation data; enforcement runs through Title 17's general zoning provisions. Because floodplain compliance is part of the zoning title, the building inspector can withhold or revoke a permit issued without the required base flood elevation study under Sections 17.60.040 and 17.60.050, and fines reach up to three hundred dollars per day per violation under Section 17.60.090.
Frequently Asked Questions
Does Revere require homes to be built a set number of feet above base flood elevation?
When must a developer submit base flood elevation studies in Revere?
What happens if FEMA hasn't mapped base flood elevations for my lot?
Does the City update FEMA if it finds new flood data?
Sources & Official References
Other rules in Revere
Compare Revere to another location·View the Massachusetts environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in this county handle flood elevation requirements.