Troup County, GA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard requirement
- 1 foot above base flood elevation
- Applies to
- Lowest floor including basement
- Utility equipment elevation
- 1 foot above base flood elevation
- No-data standard
- 3 feet above highest adjacent grade
- Floodproofing certifier
- Registered engineer or architect
- Governing section
- UDO § 4.4(2)(a)
Summary
In unincorporated Troup County, new construction and substantial improvements in a mapped flood hazard area must have their lowest floor, including any basement, elevated at least one foot above the base flood elevation under UDO § 4.4(2)(a). Heating, electrical and plumbing equipment must sit at the same elevation, and a registered engineer or architect must certify floodproofed alternatives.
(a)New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one (1) foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of subsection (1)(d) of this section, "elevated buildings."(i)All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one (1) foot above the base flood elevation.
Full Breakdown
Section 4.4(2)(a) of the Troup County Unified Development Ordinance sets the county's freeboard standard: where base flood elevation data exist, new construction and substantial improvement of any structure or manufactured home must have the lowest floor, including the basement, elevated no lower than one foot above the base flood elevation. If a builder instead uses solid perimeter walls to raise a structure, the design must include openings that equalize hydrostatic pressure on both sides of the walls, sized under the elevated-buildings standard of Section 4.4(1)(d): at least two openings totaling not less than one square inch of net area per square foot of enclosed area subject to flooding, with the bottom of every opening no higher than one foot above grade.
Section 4.4(2)(a)(i) extends the same one-foot freeboard to heating and air conditioning equipment, ductwork, electrical, ventilation and plumbing components. Nonresidential structures in A1-30, AE or AH zones may floodproof instead of elevate under Section 4.4(2)(b), but the building and its utilities must be watertight to one foot above the base flood elevation, with walls able to resist hydrostatic and hydrodynamic loads, and a registered professional engineer or architect must certify the design. Where base flood elevation data are missing, Section 4.4(3)(c) instead requires the lowest floor to sit at least three feet above the highest adjacent grade at the site. The Community Development Director administers these standards and certifies the recorded lowest-floor elevation for the permit file.
Violations & Fines
Failing to meet the one-foot freeboard, or building a floodproofed nonresidential structure without the required professional engineer or architect certification, violates Section 4.4 and is enforced under Chapter 1, Section 1-19 of the County Code, with each day of a noncompliant structure counted as a separate offense.
Frequently Asked Questions
How high above the flood line must I build in unincorporated Troup County?
Can I floodproof a building instead of elevating it?
What if my property has no base flood elevation data on file?
Sources & Official References
Other rules in Troup County
Compare Troup County to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.