Troup County, GA Environmental Rules: Stormwater Management (2026)
Key Facts
- Permit issuer
- Board of Commissioners
- Minimum culvert size
- 15-inch pipe
- Culvert length cap
- 20% frontage residential, 40% other
- Culvert setback
- 5 feet from side property line
- Penalty
- Code § 1-19, per-day violation
Summary
Before installing a driveway or culvert pipe in a county road right-of-way in unincorporated Troup County, owners need a permit from the Board of Commissioners, and it is separately unlawful to dump debris, trash or dirt into a road drainage ditch or drainage easement, with each day of either violation a separate offense.
Driveway permit.(a)Required. It shall be unlawful for any person to install a driveway or driveway culvert pipe in the right-of-way of a County road without having secured a permit from the Board of Commissioners or its authorized agent. ... Obstruction of drainage. No debris, trash, dirt, or other obstruction shall be placed in a road drainage ditch or drainage easement. ... Violations.(a)Any person installing a driveway or driveway culvert pipe without having secured a permit or obstructing a drainage easement shall be subject to punishment as provided in chapter 1, section 1-19 of the County Code. Each day of violation may be considered a separate offense.
Full Breakdown
Section 6.2(1) requires a permit from the Board of Commissioners or its authorized agent before installing a driveway or driveway culvert pipe in a county road right-of-way; the application must show the owner, property description, existing driveways, and the proposed culvert's size and staked location, and carries a fee from the Community Development Department's schedule. Culvert specifications are numeric: a 15-inch pipe is the minimum, larger where drainage or grade requires it; residential and agricultural culverts run 20 to 30 feet and commercial or industrial culverts up to 40 feet, with riprapped ends where the road superintendent requires; culvert ends must sit at least 5 feet from the side property line, culverts must be at least 20 feet apart, and total culvert length is capped at 20 percent of lot frontage for single-family residential use and 40 percent for other uses, with one 20-foot culvert guaranteed if frontage is under 100 feet (Sec.
6.2(3)-(5)). Contractors and homebuilders may not let construction dirt, mud or debris accumulate in road ditches or drainage areas so as to stop or alter the flow of water, and must install erosion and sedimentation controls before starting construction (Sec. 6.2(2)). Obstructing a road drainage ditch or drainage easement with debris, trash or dirt is separately banned (Sec. 6.2(7)). Variances are available where compliance creates excessive hardship, decided by the Board of Commissioners (Sec. 6.2(9)), and a noncompliant driveway or culvert must be removed on notice or the county removes it and files a lien against the owner for the cost (Sec. 6.2(10)(b)).
Violations & Fines
Installing a driveway or culvert without a permit, or obstructing a drainage ditch or easement, is punishable under Sec. 6.2(10)(a) and Troup County Code § 1-19, with each day treated as a separate offense; a culvert that doesn't meet county specifications must be removed on notice, and if the owner doesn't act, the county removes it and files a lien against the property for the equipment and labor cost.
Frequently Asked Questions
Do I need a permit to install a culvert pipe on my property in Troup County?
What size culvert pipe does Troup County require?
Can I block a drainage ditch on my property?
Sources & Official References
Other rules in Troup County
Compare Troup County to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.