Key Facts
- Governing section
- Municipal Code § 6-9.501(c)
- Freeboard requirement
- 1 ft. above base flood elevation
- AO zone alternative
- 3 ft. above grade if no depth shown
- Certification required at
- First form inspection
- Manufactured home pier height
- 36 in. minimum above grade
Summary
New residential construction and substantial improvements in a Yuba City special flood hazard area must have the lowest floor, including any basement, elevated at least one foot above the base flood elevation, certified by a licensed engineer or surveyor at first form inspection.
(c)Elevation and floodproofing.(1)Residential new construction or substantial improvement shall have the lowest floor, including basement:(ii) ... In an A zone where no base flood elevations have been determined, elevated at least one ft. above the base flood elevation, as determined by the floodplain administrator through acceptable methods as listed in FEMA book "Managing Floodplain Development in Approximate Zone A Areas; A Guide for Developing Base (100 year) Flood Elevations"; and(iii)In all other zones, elevated at least one ft. above the base flood elevation. At first form inspection, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor. Such certification or verification shall be provided to the Floodplain Administrator.
Full Breakdown
401. In an A zone where FEMA has not determined base flood elevations, the floor must sit at least one foot above the base flood elevation as the Floodplain Administrator determines using FEMA's approximate Zone A methodology; in every other zone, the same one-foot freeboard above base flood elevation applies. In an AO zone, the standard instead ties to the depth number printed on the Flood Insurance Rate Map, requiring elevation above the highest adjacent grade that exceeds that depth number by at least one foot, or at least three feet above the highest adjacent grade if no depth number is shown.
A registered professional engineer or surveyor must certify the lowest floor elevation at the first form inspection, with that certification provided to the Floodplain Administrator, the Public Works Director. Nonresidential buildings may instead be floodproofed watertight below that same elevation if a registered engineer or architect certifies the structure meets the floodproofing standard. 504: homes placed or substantially improved on sites in zones A1-30, AH, and AE on Sutter County's Flood Insurance Rate Map, whether outside a park, in a new or expanded park, or replacing a home with substantial flood damage, must sit on a permanent foundation with the lowest floor at least one foot above base flood elevation and be securely anchored against flotation, collapse, and lateral movement. In an existing manufactured home park, the alternative is a chassis on reinforced piers at least 36 inches above grade, also securely anchored.
Violations & Fines
Constructing or substantially improving a residential structure without meeting the one-foot freeboard elevation in Section 6-9.501(c), or without the engineer or surveyor certification at first form inspection, is a violation of the Flood Damage Prevention chapter and can be enforced under Section 6-9.403(g)'s remedial-action authority tied to the Section 6-9.303 compliance requirement.
Frequently Asked Questions
How high above base flood elevation must a new Yuba City home be built?
Who certifies the flood elevation of a new building in Yuba City?
What are the flood elevation rules for manufactured homes in Yuba City?
Sources & Official References
Other rules in Yuba City