Abilene, TX Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Abilene, TX, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required
- Before any construction/earth change in a floodway
- Issuing authority
- Floodplain Administrator, City of Abilene
- Decision timeline
- 20 working days after complete application
- Appeal deadline
- 10 days to City Council
- Fee
- Set by City Council fee resolution
- Key exemptions
- Farming, routine yard care, emergency repairs
Summary
Abilene requires a Floodway Development Permit from the Floodplain Administrator before any building construction or earth change on property inside a mapped floodway. The Land Development Code exempts bona fide farming, routine yard maintenance, emergency repairs, and public utility excavation. The Administrator must approve or deny a complete application within 20 working days, and a City Council appeal is available within 10 days of a denial or revocation.
(a)Floodway Development Permit Requirements. A Floodway Development Permit, as defined and regulated by this Division, shall be required prior to the commencement of any building construction, or earth change, of any property within a designated floodway. Floodway Development Permits shall not be required for activities listed in 3.2.11.2(b) [3.2.11.5(b)]. A separate permit shall be required for each separate, noncontiguous site or lot, and no permit shall be transferable without the prior written consent of the Floodplain Administrator. ... (c) A written application for a Floodway Development Permit shall be filed with the Floodplain Administrator... and shall be accompanied by the payment of a permit fee, the amount of which shall be determined by fee resolution by the City Council... (e) Within twenty (20) working days after receipt of a complete application for a Floodway Development Permit application... the Floodplain Administrator shall either approve or deny the permit application.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 14).
Full Breakdown
5 of the Abilene Land Development Code makes a Floodway Development Permit mandatory before any building construction or earth change on property located within a designated floodway. The permit is issued per site: a separate application covers each noncontiguous parcel, and no permit can be transferred to a new owner without the Floodplain Administrator's written consent. Four categories of activity are exempt under subsection (b): bona fide agricultural and farming operations that meet the zoning code, customary grounds maintenance and home gardening that does not affect stormwater drainage, emergency repairs of a temporary nature necessary to preserve life, health or property, and excavation for public streets, utilities or service lines.
To apply, an owner files a written application with the Floodplain Administrator, accompanied by a permit fee set by City Council fee resolution and on file with the City Secretary. 6. Once a complete application is on file, the Floodplain Administrator has 20 working days to approve or deny it, and can request an engineering conference if the submission is technically deficient. Approval conditions bar any earth change that creates a public hazard, obstructs a watercourse, or increases runoff above natural-condition levels, and in the regulatory floodway a permit cannot issue until the applicant proves no rise in flood levels community-wide.
Violations & Fines
Earth change or construction inside a floodway without an approved permit, or work that breaches permit conditions, draws a written stop-work order from the Floodplain Administrator under Section 3.2.11.11. The Administrator may revoke or suspend the permit for violating its conditions, breaching any applicable law or ordinance, or creating a nuisance, hazard, or danger to life or property; a revocation triggers a stop-work order covering all related construction, utility and drainage work. A revocation or suspension may be appealed to the City Council if written notice is filed with the City Secretary within 10 days.
Frequently Asked Questions
Do I need a permit to build inside an Abilene floodway?
How long does the City of Abilene take to decide a floodway permit application?
What activities are exempt from Abilene's floodway permit requirement?
Can the City revoke a Floodway Development Permit after it is issued?
Sources & Official References
Other rules in Abilene
Texas rules heatmap·Compare Abilene to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.