Skip to main content
CityRuleLookup

Rochester, NY Environmental Rules: Flood Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Rochester, NY, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required
For any development in a mapped flood hazard area
Issuing authority
Commissioner of Neighborhood and Business Development
Application fee
$250, plus review deposit up to $500
Penalty
Up to $250 fine or 15 days jail, or both
Flood maps
FIRM panels effective July 31, 2024, Community No. 360431
Governing law
City Charter Art. XIX, Local Law No. 1-2025

Summary

Any construction, fill, excavation or other development inside a mapped area of special flood hazard in Rochester requires a floodplain development permit from the city's Local Administrator before work starts. Applications need scaled plans showing elevations and structures, plus a $250 fee. Building without one is unlawful under Article XIX of the City Charter.

Purpose. A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and insuring that new development is constructed in a manner that minimizes its exposure to flooding. It shall be unlawful to undertake any development in an area of special flood hazard, as shown on the Flood Insurance Rate Map enumerated in § 19-3B, without a valid floodplain development permit. Application for a permit shall be made on forms furnished by the Local Administrator and may include, but not be limited to, plans, in duplicate, drawn to scale and showing: the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities, and the location of the foregoing.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4935326; v86 updated 2026-06-16; through 06-16-2026).

Full Breakdown

Rochester's floodplain rules sit in Article XIX of the City Charter, "Flood Damage Prevention" (added by Local Law No. 1-2025), and apply to every area of special flood hazard mapped on the city's Flood Insurance Rate Map panels, effective July 31, 2024, under FEMA Community Number 360431. The Commissioner of Neighborhood and Business Development, or a designee, serves as the Local Administrator under § 19-4A and both grants and denies permits. An applicant must submit plans in duplicate, drawn to scale, showing the nature, location, dimensions and elevations of the site, existing or proposed structures, fill, and drainage facilities, along with a $250 application fee; the Local Administrator can require a deposit of up to $500 to cover review, inspection and approval costs (§ 19-4B(2)).

Once the lowest floor is built, the permit holder must submit an as-built elevation certified by a licensed engineer or surveyor (§ 19-4C(1), § 19-4D(4)). No building or land in a special flood hazard area may be occupied until the Local Administrator issues a certificate of compliance (§ 19-4D(7)), and the Local Administrator keeps permits, certificates, elevation records and variance files on file for public inspection (§ 19-4D(8)). The Flood Insurance Study and maps are kept at the Flood Damage Prevention Administrator's office, Room 125-B, City Hall, 30 Church Street.

Violations & Fines

Undertaking development in a mapped flood hazard area without a valid permit, or violating any permit condition, is a violation of Article XIX. Conviction carries a fine of up to $250 or up to 15 days in jail, or both, with each day of noncompliance charged as a separate offense (§ 19-3E). The Local Administrator can also issue a stop-work order for unpermitted or noncompliant construction (§ 19-4D(6)(a), (b)), and any structure found noncompliant without an approved § 19-6 variance is reported to FEMA.

Frequently Asked Questions

Do I need a permit to build in a Rochester flood zone?
Yes. Any construction, fill, excavation or other development within a mapped area of special flood hazard needs a floodplain development permit from the Local Administrator before work begins, under City Charter § 19-4B(1). Applications require scaled plans showing elevations, structures and drainage, plus a $250 fee, and the Local Administrator may hold a deposit of up to $500 for review costs.
Who enforces Rochester's flood damage prevention rules?
The Commissioner of Neighborhood and Business Development, or a designee, serves as the Local Administrator under City Charter § 19-4A, reviewing permit applications, inspecting construction, issuing stop-work orders and signing off on certificates of compliance before a building in the flood zone can be occupied.
What happens if I build in the flood zone without a permit?
It is unlawful under City Charter § 19-3E. Violators face a fine up to $250 or up to 15 days in jail, or both, with each day of noncompliance a separate offense, and an uncorrected structure without an approved variance gets reported to FEMA.

Sources & Official References

Other rules in Rochester

All Rochester rules

New York rules heatmap·Compare Rochester to another location·View the New York environmental rules overview

Get notified when Flood Zones in Rochester, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.