Rose Hill, NC Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Rose Hill, NC, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required
- Before any development activity in a mapped flood zone
- Flood study date
- Duplin County FIS dated June 19, 2020
- Applies in ETJ
- Yes, extraterritorial jurisdiction expressly included, § 150.06
- Penalty
- Class 1 misdemeanor, up to $100 fine, 30 days
- Permitting official
- Town Administrator, as Flood Plain Administrator
Summary
Any development inside a Rose Hill Special Flood Hazard Area, including its extraterritorial jurisdiction, needs a flood plain development permit before work starts. The town maps those hazard areas from the Duplin County Flood Insurance Study dated June 19, 2020 and the FEMA DFIRM panels adopted with it, under Chapter 150 of the Code of Ordinances.
§ 150.06 LANDS TO WHICH THIS CHAPTER APPLIES. ... This chapter shall apply to all Special Flood Hazard Areas within the jurisdiction, including Extra-Territorial Jurisdictions (ETJ) as allowed by law, of the town. ... § 150.07 BASIS FOR ESTABLISHING THE SPECIAL FLOOD HAZARD AREAS. The Special Flood Hazard Areas are those identified under the Cooperating Technical State (CTS) agreement between the state and FEMA in its FIS dated June 19, 2020 for Duplin County and associated DFIRM panels, including any digital data developed as part of the FIS, which are adopted by reference and declared a part of this chapter, and all revisions thereto. ... § 150.08 ESTABLISHMENT OF FLOOD PLAIN DEVELOPMENT PERMIT. A flood plain development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities within Special Flood Hazard Areas as determined in § 150.07.
Full Breakdown
06. 07 fixes exactly which land counts as a Special Flood Hazard Area: the areas identified under the Cooperating Technical State agreement between North Carolina and FEMA in the Flood Insurance Study dated June 19, 2020 for Duplin County, together with the associated Digital Flood Insurance Rate Map (DFIRM) panels and any digital data developed as part of that study, all adopted by reference and updated as FEMA revises them. 08 then sets the actual permit rule: a flood plain development permit is required before any development activity begins in one of those mapped areas.
05 defines it to include fill, bulkheads, piers, pools, docks, landings, ramps, and erosion control or stabilization measures, so a homeowner adding a pool or dock in a mapped flood zone needs the permit just as a builder does. 09 backstops the permit rule with a general compliance requirement: no structure or land may be located, extended, converted, altered, or developed in any way without full compliance with the chapter. 25, reviews and issues these permits and can require an elevation certificate or other proof of compliance before signing off.
Violations & Fines
Developing without a flood plain development permit, or failing to comply with the chapter's terms, is a Class 1 misdemeanor under § 150.99: a fine of up to $100, up to 30 days in jail, or both, with every day the violation continues counted as a separate offense. The town can also pursue other lawful remedies against the property beyond the criminal fine.
Frequently Asked Questions
Do I need a permit to build in a Rose Hill flood zone?
Does this apply outside the Rose Hill town limits?
How does Rose Hill decide which land is in the flood zone?
Sources & Official References
Other rules in Rose Hill
Compare Rose Hill to another location·View the North Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.