Seaside, OR Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Seaside, OR, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Governing law
- Chapter 152 as replaced by Ordinance No. 2025-04
- Permit trigger
- Any development in a special flood hazard area, including fill
- Flood maps adopted
- Clatsop County FIS dated June 20, 2018, with FIRMs
- Floodplain Administrator
- Community Development Director
- Maps on file
- City Hall, 989 Broadway, Seaside
- Penalty
- Misdemeanor: fine up to $500.00, up to 180 days, or both
Summary
Seaside requires a floodplain development permit before construction or development begins anywhere in a special flood hazard area, covering all structures, manufactured dwellings and other development including fill. Ordinance No. 2025-04 repealed and replaced Chapter 152, and a violation is a misdemeanor punishable by a fine of not more than $500.00, imprisonment up to 180 days, or both.
The special flood hazard areas identified by the Federal Insurance Administrator in a scientific and engineering report entitled "The Flood Insurance Study (FIS) for Clatsop County Oregon and Incorporated Areas Volume 1 & 2 dated June 20, 2018, with accompanying Flood Insurance Rate Maps (FIRMs) are hereby adopted by reference and declared to be a part of this ordinance. ... shall constitute a misdemeanor. Any person who violates the requirements of this ordinance shall, upon conviction thereof, be fined not more than $500.00 or imprisonment for a period not to exceed 180 days or both. ... A development permit shall be obtained before construction or development begins within any area horizontally within the special flood hazard area established in Section 152.3.2. The development permit shall be required for all structures, including manufactured dwellings, and for all other development, as defined in Section 152.2.0, including fill and other development activities.
Full Breakdown
Chapter 152, Flood Damage Prevention, was repealed and replaced by Ordinance No. 2025-04, whose recitals explain why: on July 15, 2024, FEMA notified Seaside that it must select and apply a Pre-Compliance Implementation Measure to all floodplain development, which required revisions to the city's ordinance. The replacement chapter applies to all special flood hazard areas within the city (§ 152.3.1). Those areas are the ones identified in the Flood Insurance Study for Clatsop County Oregon and Incorporated Areas dated June 20, 2018, with its Flood Insurance Rate Maps, which are adopted by reference, and the FIS and FIRM panels are on file at City Hall at 989 Broadway (§ 152.3.2). The chapter is administered and enforced in conjunction with the Oregon Specialty Codes (§ 152.3.3).
The Community Development Director is appointed Floodplain Administrator, administers and enforces the chapter by granting or denying development permits, and can delegate authority (§ 152.4.1). Section 152.4.3.1 requires a development permit before construction or development begins within the special flood hazard area, for all structures including manufactured dwellings and for all other development as defined in § 152.2.0, including fill. The application is made on forms the Floodplain Administrator furnishes, with plans drawn to scale showing the nature, location, dimensions and elevations of the area, plus the items listed in § 152.4.3.2: the proposed lowest floor elevation in riverine zones, the elevation of the bottom of the lowest structural member in coastal zones, the floodproofing elevation and an engineer or architect certification for non-residential floodproofing, a description of any watercourse alteration, base flood elevation data for subdivisions, a substantial improvement calculation, and the amount and location of any fill or excavation. In reviewing permits the administrator confirms that all other required local, state and federal permits have been obtained and checks whether the proposal lies in a floodway (§ 152.4.2.1).
A variance is for floodplain management purposes only and does not change federal flood insurance premium rates (§ 152.4.4). An applicant granted a variance to build below the Base Flood Elevation receives written notice that insurance premium rates will increase (§ 152.4.4.2).
Violations & Fines
Failure to comply with the chapter, including violations of conditions and safeguards attached to a permit, is a misdemeanor. On conviction a person is fined not more than $500.00 or imprisoned for a period not to exceed 180 days or both (§ 152.3.4.2). The same section bars constructing, locating, extending, converting or altering any structure or land without full compliance, and it does not prevent the city from taking any other lawful action needed to prevent or remedy a violation.
Frequently Asked Questions
Do I need a permit to fill land in a Seaside flood zone?
Who issues floodplain permits in Seaside?
Where can I see Seaside's flood maps?
What is the penalty for breaking Seaside's flood rules?
Does a variance lower my flood insurance in Seaside?
Sources & Official References
Other rules in Seaside
Compare Seaside to another location·View the Oregon environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.