Seaside, OR Environmental Rules: Stormwater Management (2026)
Key Facts
- Plan required
- Land disturbance over 1000 square feet
- Near streams or wetlands
- Over 500 square feet within 25 feet of a stream, watercourse or wetland
- Excavation or fill trigger
- Over 20 cubic yards on lots of 5000 square feet or less; over 50 on larger lots
- Reviewing office
- Department of Building and Code Enforcement
- Stabilizing bare soil
- Within 7 calendar days after active disturbance ends
- Inspection during storms
- Landowner or agent inspects erosion controls every 24 hours
- Sanitary sewer
- Stormwater and roof runoff barred (§ 51.017(A))
Summary
In Seaside, land disturbance over 1000 square feet needs an approved Grading and Erosion Control Plan from the Department of Building and Code Enforcement, and the threshold drops to 500 square feet within 25 feet of a stream, watercourse or wetland. Storm sewer inlets and culverts must be protected, and stormwater cannot be sent to a sanitary sewer.
Except as otherwise provided in this ordinance, no person shall commence or perform any activities described in 4.202 a-c without receiving approval of a Grading and Erosion Control Plan by the City of Seaside Department Building and Code Enforcement. A. Any land disturbing activity (i.e. clearing, grading, stripping, excavation, fill, or any combination thereof) that will affect an area in excess of 1000 square feet; B. Any land disturbing activity that will affect an area in excess of 500 square feet if the activity is within 25 feet of a stream, watercourse, or wetland; or C. An excavation, fill, or any combination thereof that will exceed 20 cubic yards on a lot or parcel that is less than or equal to 5000 square feet or 50 cubic yards on a lot or parcel that is greater than 5000 square feet. ... D. Storm sewer inlets and culverts shall be protected by sediment traps or filter barriers meeting accepted design standards and specifications. ... The landowner or their agent shall inspect erosion control measures every 24 hours during storm or rain events to ensure the erosion control measures are functioning properly.
Full Breakdown
Seaside controls stormwater impacts mainly through the grading and erosion control provisions of Article 4 of Zoning Ordinance 83-10. The stated objective in § 4.201 is to control activities that lead to soil erosion and sedimentation into watercourses, wetlands, riparian areas and public and private roadways caused by development activities, including clearing, grading, stripping, excavating and filling of land.
Under § 4.202(1), no person can start those activities without an approved Grading and Erosion Control Plan from the Department of Building and Code Enforcement when the work affects an area in excess of 1000 square feet, affects an area in excess of 500 square feet within 25 feet of a stream, watercourse or wetland, or involves excavation or fill exceeding 20 cubic yards on a lot of 5000 square feet or less, or 50 cubic yards on a larger lot. Exemptions cover cutting brush where ground cover remains intact, routine maintenance of road drainage ditches by City Public Works employees, and emergency measures to clear roadways or save endangered property. The owner or agent submits the plan on a site plan at a scale of one inch equals ten feet, showing among other items the direction of surface water flows, slope contours at two-foot intervals, soil stockpiles, and the type and location of erosion control measures. The Department then approves, approves with conditions, or disapproves in writing.
Section 4.204 sets the field standards. On-site erosion control measures must be constructed and functional before clearing or grading starts. Disturbed areas must be stabilized within 7 calendar days of the end of active disturbance, and areas with slopes greater than 12 percent need sod, mat or blanket in combination with seeding. Storm sewer inlets and culverts are protected by sediment traps or filter barriers, and sediment reaching a roadway is removed by shoveling or street cleaning, not flushing, before the end of each workday.
Two other chapters address runoff. Section 51.017 bars discharging stormwater, surface water, ground water or roof runoff to any sanitary sewer and directs it to combined or storm sewers, or to a natural outlet approved by the Superintendent. Section 96.19 bars letting rainwater, ice or snow fall from a building onto a street or public sidewalk, and bars draining overflow water onto another person's property.
Violations & Fines
Section 51.999(A) makes continuing a sewer-chapter violation past the stated time limit a misdemeanor with a fine not exceeding $500 for each violation, each day a separate offense, and division (B) allows a fine of not more than $500, imprisonment for not more than 180 days, or both. Violations of the nuisance chapter, including § 96.19 drainage, are misdemeanors with a fine not to exceed $700, each day separate (§ 96.99). The Department of Building and Code Enforcement makes regular inspections of erosion controls.
Frequently Asked Questions
When does a Seaside project need a Grading and Erosion Control Plan?
What work is exempt from the erosion control plan?
How fast must bare soil be stabilized in Seaside?
Can I connect a roof drain to the sanitary sewer in Seaside?
Sources & Official References
Other rules in Seaside
Compare Seaside to another location·View the Oregon environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.