Sebastian County, AR Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Sebastian County, AR, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required for
- Fill, grading, structures in SFHA
- Issued by
- Floodplain Administrator
- Basements
- Prohibited in flood hazard areas
- Appeals go to
- Appeal Board (§ 151.15)
- Governing ordinance
- Ord. 2023-27, passed 11-21-23
Summary
Any structural work, fill, grading, drilling, or utility installation in a special flood hazard area in unincorporated Sebastian County needs a floodplain development permit from the Floodplain Administrator before work begins.
A floodplain development permit is required for all structural development, placement of manufactured structures, clearing, grading, mining, drilling, dredging, placement of fill, excavating, watercourse alteration, drainage improvements, roadway or bridge construction, individual water or sewer installations or any other development in a special flood hazard area to ensure conformance with the provisions of this code.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-62: 2026 S-62 contains Local legislation current through April 21, 2026).
Full Breakdown
Chapter 151, Flood Damage Prevention, was adopted by Ordinance 2023-27 on November 21, 2023, and amended by Ordinance 2023-32 (December 19, 2023) and Ordinance 2024-11 (June 18, 2024). 12 requires a floodplain development permit for all structural development, placement of manufactured structures, clearing, grading, mining, drilling, dredging, placement of fill, excavating, watercourse alteration, drainage improvements, roadway or bridge construction, or individual water or sewer installations in a special flood hazard area, to ensure conformance with the code. 15. § 14-268-106 through the Arkansas Natural Resources Commission, coordinating with federal Section 404 wetlands permitting, and evaluating flood elevation, velocity, and erosion impact before deciding an application.
20(N). 20(T) confirms the permit trigger: any development proposal in the 100-year or 500-year special flood hazard area, or other high-risk area, requires the permit before construction starts.
Violations & Fines
Chapter 151 does not set its own fine schedule, so building without the required floodplain development permit, or in violation of the general standards in Section 151.20 (including the basement prohibition), falls under the county's general penalty at Section 10.99: up to $500 for a first offense (up to $1,000 for repeats) and up to $250 per day for a continuing violation.
Frequently Asked Questions
Do I need a permit to fill or grade land in a flood zone in Sebastian County?
Can I build a basement in a Sebastian County flood hazard area?
Who reviews floodplain development permit applications?
Sources & Official References
Other rules in Sebastian County
Compare Sebastian County to another location·View the Arkansas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.