Vermilion Parish, LA Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Vermilion Parish, LA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Mapped basis
- FEMA Flood Insurance Study and FIRMs dated January 19, 2011
- Permit
- Floodplain development permit required (Sec. 22-8)
- Floodplain administrator
- Parish administrator or designee
- Variance board
- Parish Police Jury acting as appeal board
- Floodway
- Encroachments prohibited without a no-increase analysis
- Lowest permit fee
- $15.00 for improvements costing $0.00 to $2,000.00
- Penalty (Sec. 1-7)
- Fine up to $500.00, up to 30 days in jail, or both
Summary
Chapter 22 of the Vermilion Parish Code applies to all areas of special flood hazard in unincorporated Vermilion Parish, adopts the FEMA Flood Insurance Study and FIRMs dated January 19, 2011, and requires a floodplain development permit from the parish floodplain administrator before building or altering land.
The chapter shall apply to all areas of special flood hazard with the jurisdiction of the parish. ... The areas of special flood hazard identified by the Federal Emergency Management Agency in the current scientific and engineering report entitled, "The Flood Insurance Study (FIS) for Vermilion Parish, Louisiana and Incorporated Areas," dated January 19, 2011, with accompanying FIRMs dated January 19, 2011, and any revisions thereto are hereby adopted by reference and declared to be a part of this article. ... A floodplain development permit shall be required to ensure conformance with the provisions of this chapter.
Full Breakdown
Chapter 22 of the Vermilion Parish Code is the parish's flood damage rule, and Sec. 22-6 applies it to all areas of special flood hazard within the jurisdiction of the parish. Sec. 22-1 defines an area of special flood hazard as land in the floodplain subject to a one percent or greater chance of flooding in any given year. Sec. 22-7 adopts by reference the Federal Emergency Management Agency study titled "The Flood Insurance Study (FIS) for Vermilion Parish, Louisiana and Incorporated Areas," dated January 19, 2011, with accompanying FIRMs of the same date and any revisions. The flood zone on a parcel is whatever those maps show. Abbeville, Kaplan and the other municipalities keep their own floodplain rules.
Building or altering anything in a mapped hazard area starts with a permit. Sec. 22-8 requires a floodplain development permit, and Sec. 22-43 appoints the parish administrator or designee as floodplain administrator. Under Sec. 22-45, the application goes to the administrator on the administrator's forms, with plans in duplicate drawn to scale showing dimensions, elevations and the location relative to the area of special flood hazard, plus the elevation of the lowest floor in relation to mean sea level. Approval or denial rests on nine factors, among them the danger to life and property from flooding or erosion, the safety of access in times of flood for ordinary and emergency vehicles, and the expected heights, velocity and duration of floodwaters. Sec. 22-73 sets permit fees by the cost of the improvement, starting at $15.00 for work costing $0.00 to $2,000.00.
Floodways carry the hardest line. Sec. 22-70 prohibits encroachments, including fill, new construction and substantial improvements, in the adopted regulatory floodway unless hydrologic and hydraulic analyses show no increase in flood levels during the base flood discharge. Sec. 22-46 makes the Police Jury the appeal board for variances. It cannot issue a variance in a designated floodway if any increase in flood levels during the base flood discharge would result, and a person aggrieved by its decision can appeal to the courts of competent jurisdiction. Sec. 22-1 was last amended September 17, 2025.
Violations & Fines
Sec. 22-72 makes noncompliance a misdemeanor punished as provided in Sec. 1-7: a fine not exceeding $500.00, imprisonment in the parish jail for a term not exceeding 30 days, or both. Each day the violation continues is a new violation, and the violator pays all costs and expenses of the case. Under Sec. 22-1, a structure without a required elevation certificate or other compliance evidence is presumed in violation until that documentation is provided.
Frequently Asked Questions
Which flood maps does unincorporated Vermilion Parish use?
Do I need a permit to build in a flood zone here?
Who decides a flood variance request?
Can I put fill or a new building in the regulatory floodway?
Sources & Official References
Other rules in Vermilion Parish
Compare Vermilion Parish to another location·View the Louisiana environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.