Grant County, WI Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Applies to
Plats and subdivisions in unincorporated Grant County
Surface water
Natural drainage course or storm sewer, approved by County Engineer
Preliminary plat decision
Planning and Zoning Committee, within 90 days
Final plat decision
Within 60 days of submission
Plat review fees
$10 plus $1 per lot, preliminary and final each
Appeal
Board of Adjustment, 30 days from the decision

Summary

In unincorporated Grant County, Wisconsin, every plat and subdivision must provide for the adequate disposal of surface water, either to a natural drainage course or to a storm sewer system approved by the County Engineer. Section 305-23 of the Grant County Subdivision Regulation Ordinance sets the rule, and the Planning and Zoning Committee reviews each plat against it.

These county ordinances apply to unincorporated areas of Grant County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 305-23. Utilities and drainage. All plats and subdivisions shall meet the following requirements: ... B. Drainage. (1) Provision shall be made for the adequate disposal of surface water either to a natural drainage course or to a storm sewer system, as approved by the County Engineer. (2) All surface drainage facilities shall connect to an adequate drainage course. (3) Land that is subject to flooding periodically shall be provided with such improvements as may be required to remove flooding hazards from proposed subdivision lots.

Full Breakdown

Section 305-23 of the Grant County Code sits in Ch. 305, the Grant County Subdivision Regulation Ordinance, which § 305-4 says has full force and effect in the unincorporated areas of Grant County. Part B of the section is the drainage rule. Provision must be made for the adequate disposal of surface water, either to a natural drainage course or to a storm sewer system, and the County Engineer approves which one is used. All surface drainage facilities must connect to an adequate drainage course.

Land that is subject to flooding periodically must receive whatever improvements are required to remove flooding hazards from the proposed subdivision lots. Part A of the same section ties drainage to utilities: water and sewage lines must be constructed to the property line before the streets are built, and where no approved public water supply or sanitary sewer is in proximity, a private system must meet the standards of the Grant County Private Sewage System and Sanitation Ordinance, now Ch. 225 of the Code. The rule is applied during plat review.

A subdivider files a preliminary plat with the Grant County Zoning Administrator, and the Planning and Zoning Committee has 90 days to approve, approve conditionally or reject it. Under § 305-29 the Committee can condition approval of any plat on stated conditions it deems necessary for the welfare or safety of the residents of Grant County. The Committee must approve, deny or conditionally approve a final plat within 60 days of its submission. Before final approval the improvements must be installed or guaranteed by a surety bond, a certified check or other collateral under § 305-25.

Plat review fees under § 305-35A are $10 plus $1 for each lot or parcel on the preliminary plat, and $10 plus $1 per lot on the final plat. Near water, Ch. 316 adds its own rules, and § 316-39 excludes impervious surfaces treated by stormwater ponds, infiltration basins, rain gardens or bioswales from shoreland impervious calculations.

Violations & Fines

Under § 305-35B, anyone who fails to comply with the subdivision regulations is, on conviction, subject to the forfeitures provided in §§ 236.30, 236.31, 236.32, 236.335 and 236.35, Wis. Stats., plus statutory costs, and the Grant County Corporation Counsel is authorized to file a lawsuit against violators. A person aggrieved by a Planning and Zoning Committee decision appeals to the Grant County Board of Adjustment by written notice to the Zoning Administrator within 30 days of receiving the decision.

Frequently Asked Questions

Who approves how surface water leaves a subdivision in unincorporated Grant County?
Section 305-23B(1) requires adequate disposal of surface water to a natural drainage course or a storm sewer system, as approved by the County Engineer. The Planning and Zoning Committee then approves, conditionally approves or rejects the plat, so the drainage design has to satisfy both reviews.
What happens if the land floods?
Section 305-23B(3) says land that is subject to flooding periodically must be provided with the improvements required to remove flooding hazards from the proposed subdivision lots. The Committee can also attach conditions under § 305-29 that it deems necessary for the welfare or safety of Grant County residents.
What must be in place before a final plat is approved?
Under § 305-25 the improvements must be installed, or the developer must file a surety bond, a certified check or other collateral in an amount sufficient to complete the work. If improvements are not completed within the specified time, the municipality or Committee can use the bond or check to finish them.
How can a subdivider challenge a rejected plat?
Section 305-33 allows an appeal to the Grant County Board of Adjustment by written notice filed with the Zoning Administrator within 30 days of receiving the Committee decision. A hearing is scheduled within 30 days of the notice, and a further appeal goes by writ of certiorari to Grant County Circuit Court within 30 days.

Sources & Official References

Other rules in Grant County

All Grant County rules

Compare Grant County to another location·View the Wisconsin environmental rules overview

Get notified when Stormwater Management in Grant County, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.