Grant County, WI Environmental Rules: Stormwater Management (2026)
Key Facts
- Applies to
- Plats and subdivisions in unincorporated Grant County
- Surface water
- Natural drainage course or storm sewer, approved by County Engineer
- Preliminary plat decision
- Planning and Zoning Committee, within 90 days
- Final plat decision
- Within 60 days of submission
- Plat review fees
- $10 plus $1 per lot, preliminary and final each
- Appeal
- Board of Adjustment, 30 days from the decision
Summary
In unincorporated Grant County, Wisconsin, every plat and subdivision must provide for the adequate disposal of surface water, either to a natural drainage course or to a storm sewer system approved by the County Engineer. Section 305-23 of the Grant County Subdivision Regulation Ordinance sets the rule, and the Planning and Zoning Committee reviews each plat against it.
§ 305-23. Utilities and drainage. All plats and subdivisions shall meet the following requirements: ... B. Drainage. (1) Provision shall be made for the adequate disposal of surface water either to a natural drainage course or to a storm sewer system, as approved by the County Engineer. (2) All surface drainage facilities shall connect to an adequate drainage course. (3) Land that is subject to flooding periodically shall be provided with such improvements as may be required to remove flooding hazards from proposed subdivision lots.
Full Breakdown
Section 305-23 of the Grant County Code sits in Ch. 305, the Grant County Subdivision Regulation Ordinance, which § 305-4 says has full force and effect in the unincorporated areas of Grant County. Part B of the section is the drainage rule. Provision must be made for the adequate disposal of surface water, either to a natural drainage course or to a storm sewer system, and the County Engineer approves which one is used. All surface drainage facilities must connect to an adequate drainage course.
Land that is subject to flooding periodically must receive whatever improvements are required to remove flooding hazards from the proposed subdivision lots. Part A of the same section ties drainage to utilities: water and sewage lines must be constructed to the property line before the streets are built, and where no approved public water supply or sanitary sewer is in proximity, a private system must meet the standards of the Grant County Private Sewage System and Sanitation Ordinance, now Ch. 225 of the Code. The rule is applied during plat review.
A subdivider files a preliminary plat with the Grant County Zoning Administrator, and the Planning and Zoning Committee has 90 days to approve, approve conditionally or reject it. Under § 305-29 the Committee can condition approval of any plat on stated conditions it deems necessary for the welfare or safety of the residents of Grant County. The Committee must approve, deny or conditionally approve a final plat within 60 days of its submission. Before final approval the improvements must be installed or guaranteed by a surety bond, a certified check or other collateral under § 305-25.
Plat review fees under § 305-35A are $10 plus $1 for each lot or parcel on the preliminary plat, and $10 plus $1 per lot on the final plat. Near water, Ch. 316 adds its own rules, and § 316-39 excludes impervious surfaces treated by stormwater ponds, infiltration basins, rain gardens or bioswales from shoreland impervious calculations.
Violations & Fines
Under § 305-35B, anyone who fails to comply with the subdivision regulations is, on conviction, subject to the forfeitures provided in §§ 236.30, 236.31, 236.32, 236.335 and 236.35, Wis. Stats., plus statutory costs, and the Grant County Corporation Counsel is authorized to file a lawsuit against violators. A person aggrieved by a Planning and Zoning Committee decision appeals to the Grant County Board of Adjustment by written notice to the Zoning Administrator within 30 days of receiving the decision.
Frequently Asked Questions
Who approves how surface water leaves a subdivision in unincorporated Grant County?
What happens if the land floods?
What must be in place before a final plat is approved?
How can a subdivider challenge a rejected plat?
Sources & Official References
Other rules in Grant County
Compare Grant County to another location·View the Wisconsin environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.