Harlingen, TX Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Chapter 109, § 109-124 (Subdivisions)
Drainage report must include
hydrology, hydraulics, floodplain, soils data
MS4 requirement
stormwater facility maintenance agreement & easement
Flood zone note
finished floor 18–24 in. above curb
Design storm
per city Subdivision Development Guide frequency

Summary

New subdivisions in Harlingen must submit engineered drainage plans with hydrology and hydraulic calculations, floodplain data, and stormwater flow computations before the city will approve or record a plat.

Drainage facilities shall be provided and constructed as specified by the director of public works, and/or the city engineer. The proposed subdivision must have drainage plans. The drainage report must include detailed hydrology, hydraulic calculations, flood plain data, soils data, and other data as required by the city engineer.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4546847; v3 updated 2025-07-16).

Full Breakdown

Harlingen's subdivision ordinance (Chapter 109) requires every proposed plat to include a full drainage report reviewed by the city engineer or public works director, covering hydrology, hydraulic calculations, floodplain data, soils data, and design-storm runoff in cubic feet per second. Plats in a special flood hazard area need an engineer's flood elevation certificate, and lots near drainage inlets must have finished floors set six inches above the subdivision's other floors. Subdivisions must also include a stormwater facility maintenance agreement and easement to satisfy the city's MS4 stormwater permit before recording.

Violations & Fines

Plats missing required drainage reports, flood elevation certificates, or MS4 stormwater maintenance agreements are rejected by the planning and zoning commission and cannot be recorded with Cameron County.

Frequently Asked Questions

Who reviews stormwater drainage plans for new development in Harlingen?
The city engineer and director of public works review each subdivision's drainage report, hydraulic calculations, and floodplain data before the planning and zoning commission can approve the plat.
Does Harlingen require a stormwater maintenance agreement for new subdivisions?
Yes. Under § 109-91(d)(13), plats must include a stormwater facility maintenance agreement and easement as required by the city's MS4 stormwater sewer system permit before recording.

Sources & Official References

Other rules in Harlingen

All Harlingen rules

Texas rules heatmap·Compare Harlingen to another location·View the Texas environmental rules overview

Get notified when Stormwater Management in Harlingen, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in this county handle stormwater management.

Brownsville, TX
Some Restrictions