Harlingen, TX Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Max lot grading slope
4:1
Drainage report requires
hydrology + hydraulic calcs
Watercourse buffer
high bank + 20 ft each side
Code violation fine
up to $500 per violation
Reviewing official
city engineer / public works director

Summary

Harlingen requires every new subdivision plat to include an engineered drainage plan with hydrology and hydraulic calculations, and caps lot grading at a 4:1 slope before the city will approve or record the plat.

Proposed lot grading shall produce a top of ground slope no steeper than 4:1. ... Drainage facilities shall be provided and constructed as specified by the director of public works, and/or the city engineer. ... The proposed subdivision must have drainage plans. The drainage report must include detailed hydrology, hydraulic calculations, flood plain data, soils data, and other data as required by the city engineer.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4546847; v3 updated 2025-07-16).

Full Breakdown

The city engineer or director of public works must sign off on a drainage plan before a subdivision plat can be recorded in Harlingen. The drainage report has to include detailed hydrology, hydraulic calculations, floodplain data, soils data, and a drainage area map showing anticipated stormwater flow in cubic feet per second. Where a watercourse crosses the tract, the developer must dedicate public right-of-way covering the high bank plus 20 feet on each side. Proposed lot grading is capped at a top slope of 4:1. This isn't optional design guidance, it's a prerequisite the engineering department checks before a plat can be recorded.

Violations & Fines

Harlingen Code of Ordinances § 1-7 makes violating any Code provision, including unapproved grading or a deficient drainage plan, punishable by a fine of up to $500 per violation, and noncompliant plats are simply not recorded.

Frequently Asked Questions

Does Harlingen issue a separate grading permit?
No stand-alone grading permit: grading and drainage design are reviewed and approved as part of subdivision plat processing under § 109-124 before the city engineer will let the plat record.
What must a Harlingen drainage report include?
Detailed hydrology and hydraulic calculations, floodplain data, soils data, and a drainage area map showing anticipated stormwater flow in cubic feet per second, per § 109-124(m).

Sources & Official References

Other rules in Harlingen

All Harlingen rules

Texas rules heatmap·Compare Harlingen to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Harlingen, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in this county handle erosion control.

Brownsville, TX
Some Restrictions