Skip to main content
CityRuleLookup

Islip, NY Environmental Rules: Stormwater Management (2026)

Heavy Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code
Town Code Ch. 58
MS4 Permit
NY SPDES GP-0-15-003
SWPPP Threshold
1 acre disturbance
Protected Waters
Great South Bay, Connetquot
Fine
500-37,500 dollars

Summary

Islip operates MS4 permit under NY SPDES GP-0-15-003. Town Code Chapter 58 requires stormwater pollution prevention plan (SWPPP) for any land disturbance over 1 acre. Great South Bay watershed requires special water quality measures.

Regulatory Requirements The USEPA and New York State Department of Environmental Conservation (NYSDEC) are increasing their attention in several ways. There are three State Pollutant Discharge Elimination System (SPDES) general permits required for activities associated stormwater discharges. The Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activities (MSGP) addresses stormwater runoff from certain industrial activities. This permit requires facilities to develop stormwater pollution prevention prevention plans (SWPPPs) and report the results of industry-specific monitoring to the NYSDEC on an annual basis. A federal regulation, commonly known as Stormwater Phase II, requires the General Permit for Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4 GP). MS4 Operators are required to develop a stormwater management program (SWMP) to reduce the discharge of pollutants to the maximum extent practicable. Construction activities disturbing one or more acres of soil must be authorized under the General Permit for Stormwater Discharges from Construction Activities (CGP). Permittees are required to develop a SWPPP to prevent discharges of construction-related pollutants to surface waters.

Source: NY DEC StormwaterView official code

Full Breakdown

Town of Islip is a regulated MS4 (Municipal Separate Storm Sewer System) under NY DEC SPDES program. Construction sites over 1 acre must file NOI (Notice of Intent) with DEC and prepare SWPPP. Islip Chapter 58 (Stormwater Management) requires on-site retention for new construction. Great South Bay and Connetquot River are NY Priority Waterbodies: redevelopment must treat first inch of runoff. Illicit discharges (pool water, fertilizer runoff, car wash water) to storm drains prohibited.

Violations & Fines

Illicit discharge: 500-2,500 dollar fine per event under Chapter 58. SWPPP violations: DEC civil penalties up to 37,500 dollars per day per Clean Water Act. Construction without NOI: stop work order.

Sources & Official References

Other rules in Islip

All Islip rules

New York rules heatmap·Compare Islip to another location·View the New York environmental rules overview

Get notified when Stormwater Management in Islip, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Suffolk County handle stormwater management.

Babylon, NY
Some Restrictions
Huntington, NY
Significant Restrictions