Methuen, MA Environmental Rules: Stormwater Management (2026)
Key Facts
- Reviewing board
- Community Development Board
- State standard
- Massachusetts DEP Stormwater Policy
- Local standard
- Subdivision Rules and Regulations drainage requirements
- Trigger
- Buildings over 5,000 gross square feet, not one- or two-family
- Approval lapse
- Two years without substantial use
- Penalty
- $300 per offense, each day separate
Summary
In the City of Methuen, Massachusetts, site plan approval under Article XII requires adequate provision for stormwater drainage consistent with the Community Development Board's Subdivision Rules and Regulations, a design that minimizes the extent of stormwater flow increase from the site, and compliance with the Massachusetts DEP Stormwater Policy. The Board can require drainage calculations and drainage basin studies.
C. Approval. ... Site plan approval shall be granted upon determination by the Community Development Board that the plan meets the following objectives. ... Additionally, the Community Development Board may require the applicant to provide a traffic study and/or drainage calculations to be provided to the Community Development Board in order that it may review the project in light of the standards hereunder. Any new building construction or other site alteration shall provide adequate access to each structure for fire and service equipment and adequate provision for utilities and stormwater drainage consistent with the functional requirements of the Community Development Board's Subdivision Rules and Regulations. ... (1) Minimize the volume of cut and fill, the number of removed trees six inches caliper or larger, the length of removed stone walls, the area of wetland vegetation displaced, the extent of stormwater flow increase from the site, soil erosion and threat of air and water pollution; ... (9) Ensure compliance with the Massachusetts Department of Environmental Protection Stormwater Policy.
Full Breakdown
Stormwater in the City of Methuen is handled through site plan review in Article XII of the Comprehensive Zoning Ordinance. Under § 12.2, site plan approval is required for construction of, addition to or alteration of any building over 5,000 gross square feet (single- and two-family residential structures excluded), two or more nonresidential buildings on one lot, zero front yard setbacks in the Central Business District, development of recorded CBD lots under 4,000 square feet, drive-through facilities and standalone kiosks, multifamily dwellings and day-care centers.
Section 12.3(A)(2) lets the Community Development Board require traffic impact studies, drainage basin studies and review by the Commonwealth of Massachusetts. Under § 12.3(C), the Board can require drainage calculations, impose reasonable conditions including performance guarantees at the applicant's expense, and must find that any new building construction or site alteration provides adequate provision for utilities and stormwater drainage consistent with the Board's Subdivision Rules and Regulations. Among the listed objectives, the design must minimize cut and fill, wetland vegetation displaced, the extent of stormwater flow increase from the site and soil erosion, minimize groundwater contamination from on-site wastewater disposal and hazardous substance storage, and ensure compliance with the Massachusetts Department of Environmental Protection Stormwater Policy. Subsection E limits the Board's determination to the placement of buildings, provisioning of waste disposal, surface drainage, parking areas, driveways, buffer zones and intersections.
Site plan approval needs a public hearing under § 12.8, lapses after two years if a substantial use has not commenced (§ 12.4), and is appealed under MGL c. 40A, § 17 (§ 12.7). Related provisions: stormwater run-off from a personal wireless service facility must be contained on-site (§ 11.20(E)(3)), and wind and large-scale solar applicants file operation and maintenance plans covering stormwater controls (§ 11.9, § 5.21). Open space residential developments (§ 11.21) must show a conceptual landscape plan for structural surface stormwater facilities.
Violations & Fines
Building without site plan approval, or outside its conditions, violates the Zoning Ordinance. The penalty is $300 for each offense, and each day or portion of a day a violation continues is a separate offense (§ 10.2(E), § 10.7). The Building Commissioner serves a notice of violation and order and files an action at law or in equity to restrain, correct or abate it if the order is not promptly obeyed.
Frequently Asked Questions
Which Methuen projects need site plan approval with drainage review?
What drainage information can the Board require?
What stormwater standard must a site plan meet?
Do cell facilities have their own stormwater rule?
Sources & Official References
Other rules in Methuen
Compare Methuen to another location·View the Massachusetts environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.