Newark, NJ Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing chapter
Revised General Ordinances Ch. 41:17
Applicability threshold
1,000+ sq ft impervious disturbance, 50% alteration
TSS removal standard
80% of annual average load
Water quality design storm
1.25 inches of rain in 2 hours
Core violation fine
Up to $1,000 or 90 days, or both
Dumpster-cover violation fine
Up to $100,000
Enforcing agency
Dept. of Engineering, Police Division

Summary

Newark regulates stormwater runoff from new construction under Chapter 41:17 of the Revised General Ordinances. Major and minor developments that disturb 1,000 or more square feet of impervious surface must control runoff quantity, recharge groundwater, and remove 80% of suspended solids before discharge, enforced by the Department of Engineering.

Stormwater management measures shall be designed to reduce the post-construction load of total suspended solids (TSS) in stormwater runoff generated from the water quality design storm as follows: Eighty percent removal of the anticipated load, expressed as an annual average shall be achieved for the stormwater runoff from the net increase of motor vehicle surface. ... The water quality design storm is 1.25 inches of rainfall in two hours.

Source: Newark Municipal Code — Chapter 41:17 Storm DrainageView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 5019615; v61 updated 2026-06-17; through 06-17-2026).

Full Breakdown

Chapter 41:17, adopted in its current form by Ordinance 6PSF-E on September 5, 2024, sets minimum design standards for groundwater recharge, runoff quantity, and runoff quality on "major development" and "minor development" citywide, applying to all site plans and subdivisions (§ 41:17-1-3). A redevelopment project that adds, replaces, or disturbs 1,000 or more square feet of impervious surface and alters more than 50% of a lot's existing regulated impervious or motor-vehicle surface must bring the entire existing development into compliance, not just the new portion.

For runoff quantity, the design engineer must show that post-construction runoff hydrographs for the two-, ten-, and 100-year storms do not exceed pre-construction rates, or that peak rates do not increase and downstream flooding will not worsen (§ 41:17-4-6). Groundwater recharge design must maintain 100% of the average annual pre-construction recharge volume, or infiltrate the increased runoff volume from a two-year storm, and stormwater from high-pollutant-loading areas such as vehicle maintenance yards and gas stations may not be recharged. 25 inches of rain over two hours.

5 and 10 feet per second. Chapter 41:17 also separately requires outdoor refuse containers and dumpsters to be covered (§ 41:17-11) and requires private storm drain inlets to be retrofitted to a specified design standard (§ 41:17-12).

Violations & Fines

Violating the core stormwater management requirements of §§ 41:17-1 through 41:17-10 carries a fine up to $1,000 or up to 90 days imprisonment, or both, per offense (§ 41:17-13-1). Failing to cover a refuse container or dumpster under § 41:17-11 can draw a fine up to $100,000, and failing to retrofit a private storm drain inlet under § 41:17-12 can draw a fine up to $10,000 per inlet. Each day a violation continues is a separate offense, and the City may also recover attorneys' fees and litigation costs. The Police Division, Department of Engineering, and other municipal officials enforce the chapter (§ 41:17-14).

Frequently Asked Questions

When does Newark require a stormwater management plan?
Whenever a site plan or subdivision qualifies as major or minor development, and specifically when redevelopment adds, replaces, or disturbs 1,000 or more square feet of impervious surface while altering more than half of the lot's existing regulated surface, per § 41:17-1-3.
What water quality standard must new development meet?
Projects adding a quarter-acre or more of regulated motor vehicle surface must remove 80% of the anticipated total suspended solids load, calculated using a design storm of 1.25 inches of rain over two hours, under § 41:17-4-7.
What happens if a property owner ignores Newark's stormwater rules?
General violations of §§ 41:17-1 through 41:17-10 carry a fine up to $1,000 or 90 days in jail, or both, per offense, with each day of continued violation counted separately under § 41:17-13-1.
Does Newark regulate uncovered dumpsters under this chapter?
Yes. Section 41:17-11 requires refuse containers and dumpsters to be covered, and violating that requirement carries a fine of up to $100,000 under § 41:17-13-1.

Sources & Official References

Other rules in Newark

All Newark rules

Compare Newark to another location·View the New Jersey environmental rules overview

Get notified when Stormwater Management in Newark, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.