Plainfield, NJ Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing section
- Plainfield Municipal Code § 17:12-1 (non-major development)
- Peak runoff limit
- Not above predevelopment peak rate
- Design storm, local streets
- Once in ten (10) years
- Design storm, arterials and channels
- Once in twenty-five (25) years
- Minimum storm pipe
- Fifteen (15) inches in diameter
- Article amended
- 9-9-2024, Ord. No. MC 2024-48
Summary
In the City of Plainfield, all development needs a stormwater management plan under § 17:12-1. The peak rate of runoff during and after development cannot exceed the predevelopment rate, runoff must be released in its original watershed, and collection systems are designed for a ten year or twenty-five year storm depending on the street classification.
§ 17:12-1. Stormwater management for non-major development. ... A. All development shall be provided with a stormwater management plan consisting of, but not limited to, inlets, manholes and pipes where necessary for proper surface drainage. The system shall be adequate to carry off and/or store the stormwater and natural surface runoff, which originates not only within the property in question, but also beyond the tract boundaries. ... C. The peak rate of runoff from a site during and after development shall not exceed the predevelopment peak rate of runoff. Development upstream of known areas of problem flooding shall be required to further reduce the peak rate of runoff below the predeveloped rate. Where the upstream tributary drainage area exceeds fifty (50) acres, the standards established in the Technical Manual for Stream Encroachment, N.J.A.C. 7:13-2.8, Stormwater Management, NJDEP, shall govern.
Full Breakdown
Article XII of Chapter 17 of the Plainfield Municipal Code, Stormwater Management, was amended in its entirety on 9-9-2024 by Ord. No. MC 2024-48. Section 17:12-1 covers non-major development, and § 17:12-2 and its subsections cover major development.
Under § 17:12-1, all development must have a stormwater management plan consisting of, but not limited to, inlets, manholes and pipes where necessary for proper surface drainage. The system must carry off or store stormwater and natural surface runoff that originates within the property and beyond the tract boundaries. Where possible, runoff must leave the site in the same watershed in which it originated, and must not overload existing drainage systems, create flooding or increase predevelopment erosion of adjacent lands.
The peak rate of runoff during and after development cannot exceed the predevelopment peak rate. Development upstream of known areas of problem flooding must reduce the peak rate below the predeveloped rate. Where the upstream tributary drainage area exceeds fifty (50) acres, the NJDEP Technical Manual for Stream Encroachment standards in N.J.A.C. 7:13-2.8 govern. The increase in runoff volume must be minimized, using measures such as infiltration pits, dry wells, infiltration trenches and sheet flow through vegetated areas.
Calculation methods are set out: the rational method for areas up to twenty (20) acres, with a minimum time of concentration of five (5) minutes, and hydrograph analysis (TR55) for larger areas. Collection systems must handle a storm frequency of once in ten (10) years on rural, local and minor collector streets, and once in twenty-five (25) years for secondary arterial and major collector streets and all open channels. No storm drain pipe may be smaller than fifteen (15) inches in diameter, closed conduit velocities run from two (2) to ten (10) feet per second, and inlets are spaced so surface water does not flow more than five hundred (500) feet.
Violations & Fines
Section 17:12-1 prints no fine of its own; the standards are conditions of development review. A related rule in Chapter 12, Article 10 requires dumpsters and refuse containers to be covered and not leak to the City's municipal separate storm sewer system. The Division of Inspections enforces it, with a fine not to exceed a fine up to Five Hundred Dollars ($500.00) per offense under § 12:10-6.
Frequently Asked Questions
Does every development in Plainfield need a stormwater plan?
How much runoff can a Plainfield site release?
What storm size are Plainfield drainage systems designed for?
Who enforces the dumpster stormwater rule in Plainfield?
Sources & Official References
Other rules in Plainfield
Compare Plainfield to another location·View the New Jersey environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Stormwater Management in Nearby Cities
How other cities in Union County handle stormwater management.