Kirkwood, MO Fence Regulations: Fence Permit Requirements (2026)
Key Facts
- Permit required
- Before any fence is built or rebuilt, § 5-36
- Application must show
- Height, type, materials, and a site plan
- Surveyor plan
- Not required for the site plan
- Appeal deadline
- 30 days to Board of Adjustment (§ 5-45)
- Exempt fences
- Those approved via site plan/special use review (§ 5-42(b))
Summary
Kirkwood requires a permit from the Building Commissioner before any fence is built or rebuilt anywhere in the city. Section 5-36 requires the application to list height, type and materials and include a site plan tying the fence to the property lines and street, though a licensed surveyor's plan is not required.
No fence shall be constructed or reconstructed without filing an application with the Building Commissioner and obtaining the required permit. The permit application shall include the height, type, construction materials of the fence, and a site plan. The site plan shall show the location of the fence with relation to the property lines and street/curb/sidewalk and/or house, but this provision shall not be interpreted to require a site plan by a licensed surveyor. Fees shall be in accordance with Chapter 5, Article VII, of the City of Kirkwood Code of Ordinances.
Full Breakdown
Under § 5-36, no fence may be constructed or reconstructed in Kirkwood without first filing an application with the Building Commissioner and obtaining a permit. The application must state the fence's height, type and construction materials and include a site plan showing the fence's location relative to the property lines and the adjoining street, curb, sidewalk or house, though the section specifically does not require that plan to come from a licensed surveyor. Permit fees run through the Chapter 5 building fee schedule the same as other construction permits.
Section 5-37 defines a fence broadly as any structure serving as an enclosure, wall or barrier built of posts, supports, boards, wires, stakes, rails, masonry or stone, so decorative masonry walls and retaining structures used as boundary barriers fall under the permit requirement alongside wood and chain-link fencing. Fences already approved through a separate site plan review, special use permit or other Planning and Zoning Commission procedure are exempt from needing a further § 5-36 permit under § 5-42(b). A property owner who disagrees with the Building Commissioner's decision can appeal to the Board of Adjustment under § 5-45 within 30 days, paying the fee set in § 5-109, and the Board can grant a variance on a showing of undue hardship tied to lot shape, size or an historic restoration.
Violations & Fines
Building without the required § 5-36 permit is enforced as any other Chapter 5 building violation: as a Code offense under § 1-8, and the Building Commissioner can also order the unpermitted fence altered or removed. The property owner's recourse against that order is an appeal to the Board of Adjustment under § 5-45 within 30 days of the decision.
Frequently Asked Questions
Do I need a permit to replace an old fence in Kirkwood?
What has to be in a Kirkwood fence permit application?
Can I appeal if the Building Commissioner denies my fence permit?
Sources & Official References
Other rules in Kirkwood
Compare Kirkwood to another location·View the Missouri fence regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Fence Permit Requirements in Nearby Cities
How other cities in St. Louis County handle fence permit requirements.