Brookhaven, GA Fence Regulations: Retaining Walls (2026)
Key Facts
- RS district height cap
- Four feet
- Administrative variance (director)
- Up to six feet in RS districts
- Board of appeals variance
- Up to eight feet in RS districts
- Variance documentation
- Certified field run site plan or certified topographical map
- Transition buffers
- Retaining walls not allowed
- Permit fee
- Set in the community development fee schedule
Summary
In the City of Brookhaven, Georgia, retaining walls on RS-zoned lots cannot exceed four feet in height. The community development director can grant an administrative variance up to six feet and the board of appeals up to eight feet, with an engineer- or landscape-architect-certified plan. Retaining walls also cannot sit in transition buffers.
(b)Retaining walls on RS-zoned lots may not exceed four feet in height.(1)The community development director is authorized to grant an administrative variance allowing retaining walls of up to six feet in height in RS districts if the director determines that exceptional topographical restrictions exist on the lot in context with the adjoining property that were not created by the applicant or owner.(2)The board of appeals is authorized to grant a variance allowing retaining walls of up to eight feet in height in RS districts if the board determines that exceptional topographical restrictions exist on the lot in context with the adjoining property that were not created by the applicant or owner.(3)In addition to the materials otherwise required to be submitted with a variance application, the applicant for all retaining wall height variances shall submit a certified field run site plan or a topographical map certified by an engineer or landscape architect with the application for a variance. ... (d)Retaining walls may not be located within transition buffers.
Full Breakdown
Sec. 27-957 of the Brookhaven Code governs retaining walls, and it works through a cap, two tiers of variance, and a documentation requirement. Retaining walls on RS-zoned lots may not exceed four feet in height. Two variance routes sit above that line. The community development director is authorized to grant an administrative variance allowing retaining walls of up to six feet in RS districts, and the board of appeals is authorized to grant a variance allowing retaining walls of up to eight feet. Both decision-makers must find that exceptional topographical restrictions exist on the lot in context with the adjoining property that were not created by the applicant or owner. A hillside the owner cut into does not qualify.
The engineering requirement is written into the variance. In addition to the materials otherwise required with a variance application, the applicant for every retaining wall height variance shall submit a certified field run site plan or a topographical map certified by an engineer or landscape architect. The same documentation is required for a setback variance under subsection (a)(2).
Outside RS districts, subsection (c) sets a different test: the maximum height of a retaining wall may not exceed the horizontal distance between the face of the wall and the property line of a lot containing a residential use.
Setbacks are separate from height. On a lot with a single family detached dwelling, a retaining wall under four feet in height must be set back at least the vertical height of the wall face at any point along the wall. A wall of four feet or more must be set back four feet, or 50% of the required side building setback, whichever results in a greater setback. Window wells are exempt from that setback rule, and the board of appeals can vary it where exceptional topographical restrictions exist.
Subsection (d) bars retaining walls from transition buffers. Subsection (e) lets lawfully established nonconforming retaining walls be repaired and replaced as long as the height does not increase and the footprint does not grow by more than ten percent. The section was amended most recently by Ord. No. 2025-04-01 on 4-22-2025.
Retaining walls also need the permit in Sec. 27-953, and the fee is the one in the community development fee schedule.
Violations & Fines
Building a retaining wall without a permit, above the height cap without a granted variance, or inside a transition buffer violates the zoning ordinance under Sec. 27-1221. After notice, non-emergency violations carry ten days to correct under Sec. 27-1228, each later day is a separate violation under Sec. 27-1222, and the director can revoke the permit or order work stopped under Sec. 27-1223. Sec. 27-1224 authorizes a municipal court citation.
Frequently Asked Questions
How tall can a retaining wall be in Brookhaven, Georgia?
Do I need an engineer for a retaining wall variance?
Does a retaining wall need a permit in Brookhaven?
Can I repair an old retaining wall that is over the limit?
Sources & Official References
Other rules in Brookhaven