Brookhaven, GA Parking Rules: EV Charging (2026)
Key Facts
- New development share
- At least five percent of required parking equipped with chargers
- Station cap
- No development required to install more than 25
- New single-family homes
- EVSE raceway required for future charger
- Raceway size
- Minimum of one inch with a pull rope or line
- Parking credit
- Each public charging space counts as two, up to ten percent
- Section
- Brookhaven Code § 27-698
Summary
In the City of Brookhaven, Georgia, at least five percent of required off-street parking in new RM, commercial, employment, mixed use, master planned and Peachtree Road developments, and in all new residential housing projects, must be EV charging spaces. New single-family dwellings must be wired for future charging.
(a)General.(1)Private (restricted-access) electric-vehicle (EV) charging stations are permitted as accessory uses in all zoning districts.(2)Public EV charging stations are permitted as accessory uses to allowed nonresidential uses in all zoning districts.(3)At least five percent of required minimum off-street parking in all new developments located in RM, commercial, employment, mixed use, master planned development, or Peachtree Road districts and all new developments designated as residential housing projects shall be electric vehicle parking spaces equipped with electric vehicle charging stations.a.No development shall be required to install more than 25 electric vehicle charging stations, ... (4)All new single-family dwellings (attached or detached) shall provide EVSE infrastructure to accommodate future installation of EVSE. ... (d)Posted information.(1)Information shall be posted identifying voltage and amperage levels and any type of use, fees, or safety information related to the electric vehicle charging station.
Full Breakdown
Sec. 27-698 of the Brookhaven zoning code sets three layers of EV rules: where chargers are allowed, how many new developments must provide, and how they are built. Private restricted-access charging stations are permitted as accessory uses in all zoning districts, and public stations are permitted as accessory uses to allowed nonresidential uses in all zoning districts. At least five percent of required minimum off-street parking in new developments in RM, commercial, employment, mixed use, master planned development or Peachtree Road districts, and in all new developments designated as residential housing projects, must be electric vehicle spaces equipped with charging stations. No development has to install more than 25 charging stations, and at least 10% of the minimum off-street parking requirement in excess of 500 spaces can be prepared for future EVSE with a continuous raceway of a minimum of one inch, fitted with a pull rope or line and sealed and labeled. Where a development uses secured or gated parking to meet its minimum, five percent of the secured spaces and five percent of the public spaces must be charger-equipped.
Every new single-family dwelling, attached or detached, must provide EVSE infrastructure for future installation using the same raceway specifications, and installation follows the construction and technical codes referenced in chapter 7. Public stations are reserved for parking and charging electric vehicles, while electric vehicles can park in any space designated for public parking subject to the restrictions on any other vehicle. Equipment cannot impede pedestrian, bicycle or wheelchair movement, and wheel stops, bollards or a similar device must separate vehicles from the equipment. Posted information must identify voltage and amperage levels and any use, fee or safety information, and public spaces need signs saying they are reserved for EV charging only. Equipment must stay in working order with a phone number or other contact posted.
Sec. 27-776 adds a parking credit: in garages and lots with more than ten parking spaces, each publicly accessible, signed space with public charging equipment counts as two motor vehicle spaces toward the ratios of table 8-1, capped at ten percent of the required parking. Ordinance No. 2025-04-01 amended Sec. 27-698 on 4-22-2025.
Violations & Fines
The community development director enforces the zoning ordinance under Sec. 27-1220. Building a development without the required EV spaces or EVSE infrastructure is unlawful under Sec. 27-1221, and the director can withhold permits on land with an uncorrected violation under Sec. 27-1223. Each day a violation stays uncorrected after notice is a separate violation, and Sec. 1-11 sets a fine not exceeding $1,000.00 or up to six months in jail unless otherwise provided.
Frequently Asked Questions
Do new Brookhaven developments have to include EV charging spaces?
Does a new Brookhaven house need EV wiring?
Can charging spaces count toward Brookhaven's minimum parking?
What signs must a public charging station carry in Brookhaven?
Sources & Official References
Other rules in Brookhaven
Compare Brookhaven to another location·View the Georgia parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.