Key Facts

Trigger
24 hours after a hurricane watch is issued
Duration
Until the watch or warning is lifted
Materials named
Roof tiles, lumber, scaffolding and debris
Criminal penalty
Second-degree misdemeanor, up to $500.00 or 60 days
Contractor consequence
Discipline or license revocation before the construction board
Ordinary site debris limit
14 days on the property

Summary

In the City of Bradenton, Florida, construction-related materials at a construction site must be removed or secured from 24 hours after a hurricane watch is issued until the watch or warning is lifted. A violation is a second-degree misdemeanor with a fine of up to $500.00 or 60 days, and a licensed contractor also faces discipline.

(a)It shall be unlawful for any person to allow construction-related materials (including, but not limited to, roof tiles, lumber, scaffolding and debris) to remain loose or otherwise unsecured at a construction site from 24 hours after a hurricane watch has been issued until the hurricane watch or warning has been lifted. All such materials shall be either removed from the construction site or secured in such a manner as to minimize the danger of such materials causing damage to persons or property from high winds.(b)Any person who violates this section shall be guilty of a second-degree misdemeanor and subject to a fine of up to $500.00 or imprisonment for a term not to exceed 60 days.(c)In addition to the above, a licensed contractor who violates this section shall be subject to discipline or license revocation proceedings before the city construction board of adjustment and appeals.

Full Breakdown

Section 18-2 of the Bradenton Code, titled Hurricane protection, targets one specific debris problem: loose material at construction sites when a storm approaches. It is unlawful for any person to allow construction-related materials, including roof tiles, lumber, scaffolding and debris, to remain loose or otherwise unsecured at a construction site from 24 hours after a hurricane watch has been issued until the hurricane watch or warning has been lifted. All such materials must be either removed from the construction site or secured so as to minimize the danger of damage to persons or property from high winds. The list of materials reads including, but not limited to, so it is not closed.

The trigger is a hurricane watch, not a warning, and the prohibition starts 24 hours after the watch is issued. It stays in force until the watch or warning has been lifted, so a watch that upgrades to a warning does not restart the clock.

The hurricane rule sits beside the ordinary site debris rule in § 18-1. The permit holder of any active or inactive construction project must clean up and remove all construction debris and other miscellaneous discarded articles before receiving final inspection approval. Construction job sites must be kept clean, and accumulation of construction debris cannot remain on the property for more than 14 days. All debris must be contained so it is not spread onto the property or adjacent property by any means.

A third debris provision sits in the unsafe structures ordinance. When the building official has an unsafe building demolished under § 18-36, the demolition includes removing all debris from the premises, and the cost is billed to the owner of record. Section 18-36 also lists a natural disaster such as hurricane, tornado or flood among the good-cause reasons for extending a repair or demolition deadline beyond 120 days.

Violations & Fines

A violation of § 18-2 is a second-degree misdemeanor, punishable by a fine of up to $500.00 or imprisonment not to exceed 60 days. A licensed contractor who violates it also faces discipline or license revocation proceedings before the city construction board of adjustment and appeals. Site debris left past the 14-day limit in § 18-1 falls under the general penalty in § 1-15: a fine of not more than $500.00 or up to 60 days, each day a separate offense.

Frequently Asked Questions

When does the hurricane debris rule start in the City of Bradenton?
The prohibition applies from 24 hours after a hurricane watch has been issued and lasts until the hurricane watch or warning has been lifted. During that period construction-related materials at a construction site must be removed or secured against high winds.
What materials does § 18-2 cover?
Construction-related materials, and the code names roof tiles, lumber, scaffolding and debris. The wording is including, but not limited to, so other loose construction material at the site is covered too. The rule speaks to construction sites, and it applies to any person who allows the materials to stay loose or unsecured.
What is the penalty for leaving materials unsecured?
A second-degree misdemeanor with a fine of up to $500.00 or imprisonment not to exceed 60 days. A licensed contractor also faces discipline or license revocation proceedings before the city construction board of adjustment and appeals, in addition to the criminal penalty.
How long can construction debris stay on a Bradenton job site?
Section 18-1 says construction job sites must be kept clean and accumulated construction debris cannot remain on the property for more than 14 days. The permit holder must also remove all construction debris before receiving final inspection approval, and debris must be contained so it does not spread to adjacent property.

Sources & Official References

Other rules in Bradenton

All Bradenton rules

Florida rules heatmap·Compare Bradenton to another location·View the Florida hurricane preparedness overview

Get notified when Storm Debris in Bradenton, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.