Southampton Village, NY Hurricane Preparedness: Storm Debris (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Removal deadline
Within 60 days of the damaging event
Section
Village Code § 49-9(G), Coastal Erosion Hazard Area Law
Triggers
Bluff edge failure, dune migration, wave or ice action
Structural hazard area
Shoreline receding one foot or more per year
Enforced by
The Administrator (§ 49-28)
Penalty ceiling
Fine up to $2,000 or 15 days (§ 1-17)

Summary

In the Village of Southampton, debris from structural damage inside a coastal erosion structural hazard area must be removed within 60 days of the damaging event. Section 49-9(G) of the Coastal Erosion Hazard Area Law covers damage from sudden bluff edge failure, dune migration, or wave or ice action.

The following restrictions apply to regulated activities within structural hazard areas: ... G. Debris from structural damage which may occur as a result of sudden unanticipated bluff edge failure, dune migration or wave or ice action must be removed within 60 days of the damaging event.

Full Breakdown

The 60-day rule is § 49-9(G) of Chapter 49, the Village of Southampton Coastal Erosion Hazard Area Law, adopted 12-9-1988 as L.L. No. 7-1988 under Article 34 of the New York State Environmental Conservation Law. It sits in Article III, Area Restrictions, in the list of restrictions that apply to regulated activities within structural hazard areas. The trigger is structural damage from sudden unanticipated bluff edge failure, dune migration, or wave or ice action. Once that event happens, the clock is 60 days.

Where the rule applies depends on the map. Section 49-5 defines a structural hazard area as shorelands landward of natural protective features with shorelines receding at a long-term average recession rate of one foot or more per year, and the inland boundary is measured at 40 times that annual recession rate. Under § 49-6 the Coastal Erosion Hazard Area is drawn on the final map prepared by the New York State Department of Environmental Conservation.

Neighboring provisions shape how cleanup is done. Section 49-5 lists normal beach grooming or cleanup among unregulated activities, and § 49-7 requires a coastal erosion management permit only for regulated activities, so unregulated work needs none. Dumping, grading, excavating and filling are listed as regulated activities. Section 49-9(H) bars grading, excavation or other soil disturbance in a structural hazard area that directs surface water runoff over a bluff face. Section 49-9(F) requires movable structures to be removed before any part of the structure is within 10 feet of the receding edge, and puts that duty on the last owner of record on the latest assessment roll unless a removal agreement is attached to the permit.

The rule is a removal deadline, not a pickup service. Section 49-9(G) does not name who hauls the debris, and enforcement sits with the Administrator under § 49-28. The only curbside pickup provision found in the code, § 74-2.1, covers fall leaves placed along the shoulder by the abutting owner or the owner's employee, while § 74-2 bars depositing debris on streets and public places.

Violations & Fines

Under § 49-28 the Administrator transmits written notice of violations and performs compliance inspections. Section 49-32 sends penalties to Article II of Chapter 1, where § 1-17 sets a fine not exceeding $2,000 or imprisonment not exceeding 15 days, or both, plus community service at the court's discretion. Each day of a continuing violation is a separate offense, and § 1-18 allows injunctive relief in addition to a penalty.

Frequently Asked Questions

How long do I have to remove storm debris from a damaged structure in a Southampton Village erosion area?
Section 49-9(G) requires debris from structural damage in a structural hazard area to be removed within 60 days of the damaging event. It applies to damage from sudden unanticipated bluff edge failure, dune migration, or wave or ice action. The Village of Southampton code prints no extension procedure in that subsection.
Does cleanup after a storm need a coastal erosion permit?
Section 49-5 lists normal beach grooming or cleanup as an unregulated activity, and § 49-7 requires a coastal erosion management permit only for regulated activities. Regulated activity includes grading, excavating, dumping and filling, so regrading a bluff or dune after a storm is a different question from cleanup.
Does the Village of Southampton pick up storm debris?
Section 49-9(G) sets a removal deadline and does not create a pickup service. The curbside provision in § 74-2.1 is for fall leaves placed by the abutting owner or an employee, and an independent contractor is expected to take leaves to a disposal site. Section 74-2 prohibits depositing debris on streets and public places.
Who is responsible for removing a damaged movable structure?
Section 49-9(F) requires movable structures in a structural hazard area to be removed before any part is within 10 feet of the receding edge. The last owner of record on the latest assessment roll is responsible for the structure and its foundation unless a removal agreement was attached to the original permit.
Who enforces the debris rule?
Section 49-28 gives the Administrator authority to administer and enforce Chapter 49, including written notices of violation to property owners and compliance inspections. Convictions carry the penalties in Article II of Chapter 1, with a fine ceiling of $2,000 or imprisonment up to 15 days under § 1-17.

Sources & Official References

Other rules in Southampton Village

All Southampton Village rules

New York rules heatmap·Compare Southampton Village to another location·View the New York hurricane preparedness overview

Get notified when Storm Debris in Southampton Village, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.