Southampton Village, NY Hurricane Preparedness: Flood Elevation (2026)
Key Facts
- Zones covered
- V1-V30, VE, V and Coastal A
- Required elevation
- Bottom of lowest horizontal member two feet above base flood elevation
- Foundation
- Pilings, columns or shear walls; no spread footings or fill
- Siting
- Landward of the reach of high tide
- Space below elevated floor
- Parking, building access or storage only
- Wood pile spacing
- No more than 12 feet on center under load bearing members
Summary
In the Village of Southampton's V, VE and Coastal A flood zones, new and substantially improved homes must stand on pilings, columns or shear walls with the bottom of the lowest horizontal structural member at least two feet above base flood elevation. Spread footings and fill cannot carry the structure, and the design must resist wind and water loads acting together.
The following standards, in addition to the standards in § 62-15A, Coastal high hazard areas and Coastal A Zones, and § 62-15B, Subdivision and development proposals, and § 62-16, Standards for all structures, apply to new and substantially improved residential structures located in areas of special flood hazard shown as Zones V1-V30, VE, V, or Coastal A on the community's Flood Insurance Rate Map designated in § 62-6. A. Elevation. New construction and substantial improvements shall be elevated on pilings, columns or shear walls such that the bottom of the lowest horizontal structural member sup- porting the lowest elevated floor (excluding columns, piles, diagonal bracing attached to the piles or columns, grade beams, pile caps and other members designed to either withstand storm action or break away without imparting damaging loads to the structure) is elevated to or above two feet above base flood elevation so as not to impede the flow of water. ... (2) Spread footings and fill material shall not be used for structural support of a new building or substantial improvement of an existing structure.
Full Breakdown
Section 62-18 governs residential structures in the Village's coastal high hazard areas, the zones mapped as V1-V30, VE, V or Coastal A on the FEMA Flood Insurance Rate Map. Its standards stack on top of § 62-15(A), § 62-15(B) and § 62-16. Under § 62-15(A), all new construction in those zones must be located landward of the reach of high tide, the use of fill for structural support is prohibited, and man-made alteration of sand dunes that would increase potential flood damage is prohibited.
Elevation is measured to the bottom of the lowest horizontal structural member supporting the lowest elevated floor, which must be at or above two feet above base flood elevation so as not to impede the flow of water. Columns, piles, diagonal bracing, grade beams, pile caps and other members designed to withstand storm action or break away are excluded from that measurement.
The structure has to carry the storm. Section 62-18(B) requires the design to consider wind and water loads acting simultaneously during the base flood, including wave inertial and drag forces, current drag forces and impact forces from waterborne storm debris, with dynamic uplift loads considered where bulkheads, walls or other obstructions could cause wave runup beyond the base flood elevation. The design ratio of pile spacing to pile diameter cannot be less than 8:1 for individual piles, wood piles can be no more than 12 feet on center under load bearing sills, beams or girders, and minimum penetration is to five feet below mean sea level datum when the base flood elevation is +10 msl or less, or at least 10 feet below msl when it is greater. Round timber piles need a tip diameter of 8 inches, and toe nailing as a principal method of connection is not permitted.
Space below the elevated floor is restricted. Under § 62-16(B)(4) it must be free from obstruction or enclosed only with non-supporting breakaway walls, open wood lattice-work or insect screening, and it can be used only for parking vehicles, building access or storage. Human habitation there is expressly prohibited. Breakaway wall designs with strengths over 20 pounds per square foot need certification from a licensed professional engineer or architect with the permit application (§ 62-13(I)).
Violations & Fines
Non-compliant coastal construction is punishable under § 62-9 by a fine of no more than $250 or imprisonment for not more than 15 days, or both, with each day of noncompliance a separate offense. The local administrator issues a stop-work order for non-compliant development, and in V zones the certificate of elevation for the bottom of the lowest structural member must be submitted when the lowest floor is placed. Work done before approval of that certification proceeds at the permit holder's risk (§ 62-14).
Frequently Asked Questions
How high above the flood level must a coastal house be in the Village of Southampton?
Can I enclose the space under an elevated house in a V zone?
Can fill be used to raise a lot or support a house in a V zone?
What elevation certificate is required once the floor is placed?
Sources & Official References
Other rules in Southampton Village
New York rules heatmap·Compare Southampton Village to another location·View the New York hurricane preparedness overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation in Nearby Cities
How other cities in Suffolk County handle flood elevation.