Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit category
Miscellaneous Permits, storm shutters, Table 5-1
Permit fee
1.75% of RSM/s subcontract cost
Minimum fee
$95.00 citywide floor
Governing standard
Florida Building Code (Broward County), § 5-9
No-permit penalty
$400 or double fee (contractor); double fee (owner)

Summary

Plantation treats storm shutters as a permitted building improvement, not a self-install item: installation falls under the Miscellaneous Permits line of the City's Table 5-1 fee schedule at 1.75% of project cost, subject to a $95 minimum, and the work itself must meet the Florida Building Code (Broward County) adopted as the City's building code.

Table 5-1 Building Permit Fees ... Miscellaneous Permits: (i.e., concrete slabs, paver patios, pool decks, screens enclosures, fences, shed, windows, doors, storm shutters, gazebos, garage doors, driveways, retaining walls, seawalls, dumpster/compactor enclosures, awnings, raising mechanical equipment (as part of roof replacement), etc.) 1.75% of RSM/s. Except as noted by a fixed flat fee less than ninety-five dollars ($95.00), the minimum permit fee shall be ninety-five dollars ($95.00). Section 5-9 - Building Codes Adopted: The latest edition of the Florida Building Code, (Broward County), as amended, and such amendments which may be enacted, from time to time, is hereby adopted as the building code of the City.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 1).

Full Breakdown

Section 5-9 of the Code of Ordinances, Building Codes Adopted, makes the latest edition of the Florida Building Code (Broward County), as amended from time to time, the building code of the City of Plantation; any state-wide building code the legislature later imposes on municipalities would likewise become the City's code. That adoption is what sets the technical wind-load and opening-protection requirements a shutter installation must satisfy, since Plantation's own code does not restate FBC engineering standards separately. 75% of the RSM/s subcontract-cost calculation described in Section 5-5, with the citywide minimum permit fee of $95 applying if that percentage computes lower.

Before that fee is charged, Section 5-6 requires plans and specifications to go through the Building Department's review cycle: submittal, plan review, and if needed a revision resubmittal and a second review, each carrying its own nonrefundable review fee starting at $20 plus $10 per additional sheet-discipline. A homeowner or contractor who installs shutters without first pulling the permit is exposed under Section 5-7's 'Work without a Permit' provision: a licensed contractor is charged a $400 fee or double the permit fee, whichever is greater, and an owner who proceeds without a permit is charged double the permit fee outright.

Violations & Fines

Installing storm shutters, jalousies, or similar opening-protection hardware without first obtaining a building permit triggers the Work-Without-a-Permit charge in Section 5-7: a licensed contractor owes $400 or double the normal permit fee, whichever is greater, and a property owner who does the work owes double the permit fee. A contractor who fails to request the final inspection once the shutter work is complete becomes ineligible for further City permits until paying a $200 fee and passing that final inspection.

Frequently Asked Questions

Do I need a permit to install accordion or roll-down hurricane shutters in Plantation?
Yes. Section 5-7's Table 5-1 lists storm shutters under Miscellaneous Permits, charged at 1.75% of the subcontract cost with a $95 minimum fee, and the Building Department must review plans before the permit issues.
What building standard governs how strong my shutters must be?
Section 5-9 adopts the Florida Building Code (Broward County) as the City's building code, and that code, not a separate Plantation ordinance, sets the wind-load and opening-protection engineering standards shutters must meet.
What happens if I put up shutters before getting a permit?
Under Section 5-7's work-without-a-permit rule, a licensed contractor is charged $400 or double the permit fee, whichever is greater, and a property owner who installs shutters without a permit is charged double the normal permit fee.

Sources & Official References

Other rules in Plantation

All Plantation rules

Florida rules heatmap·Compare Plantation to another location·View the Florida hurricane preparedness overview

Get notified when Hurricane Shutters in Plantation, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Hurricane Shutters in Nearby Cities

How other cities in Broward County handle hurricane shutters.

Coral Springs, FL
Some Restrictions
Miramar, FL
Some Restrictions