Gilroy, CA Invasive Plant Rules: Prohibited Species (2026)
Key Facts
- Invasive species buffer
- 150 feet from top of bank
- Non-native species between banks
- not allowed at all
- Streamside review area
- within 50 feet of top of bank
- Landscaping standard
- must follow Consolidated Landscape Policy
- Governing chapter
- Gilroy City Code Chapter 27A
Summary
Within a streamside review area, Gilroy City Code Section 27A.5(a)(1) bars new invasive species plantings within 150 feet of the top of bank and bans planting any non-native species between the top of banks outright, as part of the City of Gilroy's riparian corridor protection standards administered under Chapter 27A.
Removal of native vegetation is not permitted. Non-native species are not allowed to be planted between top of banks. Invasive species are not allowed within one hundred fifty (150) feet of top of bank. All new landscaping must comply with the adopted City of Gilroy’s Consolidated Landscape Policy.
Full Breakdown
Chapter 27A's Article II stream protection rules apply to all properties within a streamside review area, defined in Section 27A.2 as land within 50 feet of the top of bank of a stream. Under the riparian corridor protection standard at Section 27A.5(a)(1), removal of native vegetation is flatly not permitted, no non-native species may be planted between the top of banks at all, and invasive species specifically are barred from a wider 150-foot buffer measured from the top of bank. Any new landscaping in the area must also comply with the City of Gilroy's adopted Consolidated Landscape Policy.
These riparian rules apply on top of the chapter's broader building and site requirements, which also govern bank stability setbacks, erosion control, grading, and floodplain conveyance near streams. Section 27A.4 exempts narrow categories of work from full chapter review, including remodels of existing single-family homes on lots of 10,000 square feet or less, under three cubic yards of earthwork, interior alterations, small storage buildings of 120 square feet or less, sewer or water lateral replacement, re-roofing, low wood fences set back from the bank, and any modification 50 feet or more from the top of bank or riparian corridor edge, whichever is greater; none of those exemptions apply if the activity occurs directly in the stream channel.
Non-exempt property owners must submit development plans under Section 27A.6 showing bank stabilization and revegetation efforts before work proceeds, reviewed alongside any other required city permits.
Violations & Fines
The code text supplied does not print a standalone penalty schedule specific to Chapter 27A violations; compliance is enforced through the development permit review process required by Section 27A.6, under which non-exempt work in the streamside review area must be reviewed and approved before it may proceed alongside other city permits for the same project.
Frequently Asked Questions
How close to a Gilroy creek can I plant an invasive species?
Does this rule apply to my whole property or just near the creek?
Is my landscaping remodel exempt from Gilroy's stream protection rules?
Sources & Official References
Other rules in Gilroy
California rules heatmap·Compare Gilroy to another location·View the California invasive plant rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Prohibited Species in Nearby Cities
How other cities in Santa Clara County handle prohibited species.