Skip to main content
CityRuleLookup

Columbia, SC Landscaping Rules: Rainwater Harvesting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Rain capture credit
0.50 points
Minimum storage
500 gallons per 2 units
Residential min points
3 (3-29 units), 4 (30+)
Nonresidential min points
3 (5,000-25,000 sf), 4 (>25,000 sf)
Exempt projects
Under 3 units or under 5,000 sf
Review point
Reviewed at development application stage

Summary

Columbia's Unified Development Ordinance does not mandate rain barrels or cisterns outright, but new development covered by the green building standards can earn 0.50 points toward its required score by installing rain water capture and re-use devices, cisterns, rain filters, or underground storage basins sized at a minimum of 500 gallons for every two residential units, under Sec. 17-5.11(d).

Unless exempted in accordance with (2) below, all new development shall comply with the green building standards of this section. ... Development subject to the standards of this section shall achieve the following minimum number of points from the menu of options shown in Table 17-5.11(d)(4): Green Building Point System. ... Include rain water capture and re-use devices such as cisterns, rain filters, and underground storage basins for residential development with a minimum storage capacity of 500 gallons for every two residential units.

Full Breakdown

The rainwater capture credit sits inside Columbia's mandatory Green Building Point System at Sec. 11, which applies to all new development unless it is a residential project of fewer than three dwelling units, a nonresidential project under 5,000 square feet, a remodel of an existing building, or a project that has already earned LEED Gold or higher. Covered residential projects must earn 3 points for developments of 3 to 29 units or 4 points for 30 units or more; covered nonresidential and mixed-use projects need 3 points between 5,000 and 25,000 square feet, or 4 points above that.

00 point), green or vegetated roofs, cool roofs, and solar installations. A developer can mix and match any combination of menu items to reach the required point total; there is no rule that cisterns specifically must be used. Compliance is reviewed during the development application process for a planned unit development, special exception, development agreement, certificate of design approval in a Design District, or major or minor site plan, per Sec. 11(c). Applicants must document how each claimed credit will be met at the time of submittal, using invoices, receipts, or delivery confirmations for items that cannot be visually verified on inspection.

Violations & Fines

Failing to install or maintain an approved green building feature used to satisfy Sec. 17-5.11, including a rain water capture credit, is itself a violation of the Ordinance under Sec. 17-5.11(e). The city can revoke the underlying development approval or permit and strip any green building incentive granted under Sec. 17-5.12 that depended on the feature, on top of the general enforcement remedies in Article 8.

Frequently Asked Questions

Does Columbia require rain barrels or cisterns on new development?
No single feature is mandatory. Columbia's green building standards require covered new development to earn a minimum number of points from a menu of options under Sec. 17-5.11(d), and rain water capture devices, cisterns, rain filters, or underground storage basins sized at 500 gallons per two residential units are one 0.50-point option among many, including rain gardens, cool roofs, and solar installs.
Which projects have to comply with Columbia's green building point system?
All new development must comply unless it is exempt: residential projects under three dwelling units, nonresidential projects under 5,000 square feet, projects that have already achieved LEED Gold certification or higher, and remodels or alterations of existing buildings, per Sec. 17-5.11(b).
What happens if a developer removes a rain capture system used to meet the point requirement?
Failing to install or maintain a green building feature claimed for compliance is a violation of the Ordinance under Sec. 17-5.11(e). The city can revoke the development approval or permit and cancel any density, height, lot coverage, or parking incentive under Sec. 17-5.12 that depended on that feature.

Sources & Official References

Other rules in Columbia

All Columbia rules

Compare Columbia to another location·View the South Carolina landscaping rules overview

Get notified when Rainwater Harvesting in Columbia, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.