Skip to main content
CityRuleLookup

La Habra, CA Landscaping Rules: Rainwater Harvesting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
LHMC § 18.16.030.A.4
Qualifying lot size
Under 2,500 sq ft of landscape area
Water source required
100% from graywater or on-site rainwater capture
Compliance path
Appendix A of the Guidelines only
Reviewing department
La Habra Community Development Department

Summary

In the City of La Habra, a new or remodeled landscape project under two thousand five hundred square feet that meets its entire estimated water use with on-site rainwater capture or graywater, rather than the potable system, only has to follow Appendix A of the city's Water Efficient Landscaping Guidelines instead of the full Water Efficient Landscape Ordinance review under Municipal Code § 18.16.030.

4. New or rehabilitated projects using treated or untreated graywater or rainwater capture on site, any lot or parcels within the project that has less than two thousand five hundred square feet of landscape area and meets the lot or parcel's landscape water requirement (estimated total water use) entirely with the treated or untreated graywater or through stored rainwater capture on site is subject only to Appendix A of the Guidelines.

Full Breakdown

La Habra's Water Efficient Landscape Ordinance, codified at Municipal Code Chapter 18.16, normally applies its full water-budget calculations to any new landscape project of five hundred square feet or more, and to any rehabilitated landscape project of two thousand five hundred square feet or more, that requires a building or landscape permit, plan check or design review (§ 18.16.030.A.1-2). Section 18.16.030.A.4 carves out a narrower path for water harvesting: where a project uses treated or untreated graywater, or captures rainwater on site, and that captured supply alone covers one hundred percent of the lot's estimated applied water use, and the lot's landscape area is under two thousand five hundred square feet, the project need only comply with the prescriptive measures of Appendix A of the Guidelines for Implementation of the Water Efficient Landscape Ordinance rather than submit the full landscape documentation package, water budget calculations and certification otherwise required under § 18.16.040.

The Guidelines are adopted by the city and describe the specific procedures, calculations and requirements referenced throughout Chapter 18.16. Projects that qualify still must be reviewed by the community development department as part of the applicable building or landscape permit, but the reduced Appendix A path avoids the maximum applied water allowance (MAWA) calculation, the ET adjustment factor analysis and the licensed-professional certification required for standard landscape documentation packages under §§ 18.16.040 and 18.16.050.

Violations & Fines

A project that claims the rainwater/graywater exemption but fails to actually meet its full estimated water use from the captured supply loses the Appendix A shortcut and must instead complete the full landscape documentation package, water budget and certification required by §§ 18.16.040-.050. Community Development can withhold plan check approval, a landscape permit or a certificate of occupancy until compliance is verified, and a Municipal Code violation is separately punishable under § 1.08.010 as a misdemeanor, fine up to five hundred dollars and/or six months in jail.

Frequently Asked Questions

Does La Habra let me skip the water budget calculation if I capture rainwater?
Yes, but only if the captured rainwater or graywater covers all of the estimated water your landscaping needs and your lot's landscaped area is under 2,500 square feet. Section 18.16.030.A.4 then limits you to the prescriptive measures in Appendix A of the city's Guidelines instead of a full landscape documentation package.
What happens if my rain barrels don't fully cover my landscape's water use?
Then the exemption in § 18.16.030.A.4 does not apply, and your project reverts to the standard Water Efficient Landscape Ordinance process: a landscape documentation package, maximum applied water allowance calculation and licensed-professional certification under §§ 18.16.040 and 18.16.050 before the city will approve your permit.
Who reviews rainwater-harvesting landscape plans in La Habra?
The city's Community Development Department reviews landscape and irrigation plans as part of the building or landscape permit, plan check or design review process, and verifies compliance before issuing a certificate of completion or final occupancy under § 18.16.040.

Sources & Official References

Other rules in La Habra

All La Habra rules

California rules heatmap·Compare La Habra to another location·View the California landscaping rules overview

Get notified when Rainwater Harvesting in La Habra, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Rainwater Harvesting in Nearby Cities

How other cities in Orange County handle rainwater harvesting.

Fullerton, CA
Light Restrictions
Newport Beach, CA
Some Restrictions
Garden Grove, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions
Irvine, CA
Some Restrictions
Orange, CA
Some Restrictions
Huntington Beach, CA
Few Restrictions
Anaheim, CA
Few Restrictions