Somerville, MA Landscaping Rules: Rainwater Harvesting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Credit type
Optional Green Score bonus, not mandate
Threshold
50% of irrigation from harvested rainwater
Bonus multiplier
0.1, per Table 10.4.2
Applies to
New principal buildings, substantial renovations
Administered by
Building Official, §10.4.4.b
Governing table
Table 10.4.2 Green Score Bonuses

Summary

Somerville's Green Score standard for new construction and major renovations awards a bonus credit toward the required landscape performance score when at least half of a site's irrigation comes from harvested rainwater. Table 10.4.2 lists '50% of irrigation is harvested rainwater' as a 0.1 multiplier bonus under §10.4.5.b.

b. Bonuses

i. Review Boards may establish additional bonuses than those listed on Table 10.4.2 to achieve other city policy objectives based on the recommendations of the Director of Public Space & Urban Forestry.

Table 10.4.2 Green Score Bonuses Credit Multiplier Bonus Credits Publicly visible landscape 0.1 Native species 0.1 High value species 0.1 50% of irrigation is harvested rainwater 0.1 Food cultivation 0.1 De-paved Lot area 0.1

ii. Each additional bonus may have a multiplier up to one-tenth (0.1) for each bonus.

Full Breakdown

Green Score, defined in Article 10.4, is Somerville's environmental sustainability performance standard: new principal buildings and substantial renovations of a principal building must achieve a minimum weighted score, calculated under §10.4.5, by adding up the weighted value of every proposed landscape element and dividing by total lot area. Section 10.4.5.b lets the Review Boards stack additional multipliers onto that base calculation using the Bonus Credits in Table 10.4.2, and rainwater harvesting is one of six listed bonus credits: publicly visible landscape, native species, high value species, '50% of irrigation is harvested rainwater,' food cultivation, and de-paved lot area, each worth a 0.1 multiplier.

The rainwater credit is not a standalone permit requirement or a mandate to install a cistern; it is an optional way for a developer to raise a project's Green Score toward whatever minimum applies to that building type and district. Section 10.4.5.b.ii lets Review Boards cap each additional bonus at one-tenth (0.1), so the rainwater-irrigation bonus stacks with the other five bonus credits and with the base Table 10.4.1 landscape-element multipliers, such as soils, groundcovers, plants, trees, and engineered features like rain gardens and bioswales, to help a project reach compliance. The Building Official administers Green Score compliance under §10.4.4.b, and applicability is limited under §10.4.3 to new principal buildings and substantial renovations, so an ordinary remodel that is not a substantial renovation is not required to hit any Green Score target at all.

Violations & Fines

There is no separate penalty for skipping the rainwater-harvesting bonus itself, since Table 10.4.2 credits are optional; the enforceable requirement is meeting the overall Green Score minimum for the building type under §10.4.4.a. A project that submits a landscape plan claiming the bonus without irrigating at least 50% from harvested rainwater risks the Building Official rejecting the calculation and withholding approval until the score is corrected without that credit.

Frequently Asked Questions

Does Somerville require rainwater harvesting for landscaping?
No. Rainwater harvesting is an optional bonus under the Green Score standard: Table 10.4.2 awards a 0.1 multiplier credit when 50% of a site's irrigation is harvested rainwater, but a project can meet its Green Score minimum with other landscape elements instead.
What score bonus does harvesting rainwater earn in Somerville?
A 0.1 multiplier credit under Table 10.4.2, the same bonus value given to publicly visible landscaping, native species, high-value species, food cultivation, and de-paved lot area. Review Boards may stack it with other bonuses under §10.4.5.b.ii.
Which projects have to calculate a Green Score at all?
Section 10.4.3 limits Green Score to the construction of any new principal building and any substantial renovation of an existing principal building. Ordinary maintenance or minor work on an existing building does not trigger the Green Score calculation or its bonus credits.

Sources & Official References

Other rules in Somerville

All Somerville rules

Compare Somerville to another location·View the Massachusetts landscaping rules overview

Get notified when Rainwater Harvesting in Somerville, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.