Key Facts
- Regulating chapter
- Chapter 950, Comprehensive Stormwater Management
- Rainwater harvesting status
- Listed acceptable water quality SCM
- Triggers requirement
- Only for development-stage SCM compliance
- Design standard
- Rainwater and Land Development manual
- Approving agency
- City of Youngstown Public Works Department
Summary
In the City of Youngstown, Ohio, rainwater harvesting is not banned or separately licensed; Chapter 950's stormwater performance standards list it as one of the acceptable water-quality control measures a developer may install to meet post-construction stormwater requirements alongside bioretention and infiltration systems.
950.10 PERFORMANCE STANDARDS. ... (a) General: ... (1) Integrated SCMs that address degradation of water resources. ... Acceptable SCMs shall: ... ... B. Maintain predevelopment hydrology and groundwater recharge on as much of the site as practicable. Where feasible, bioretention, permeable pavement with infiltration, underground storage with infiltration, infiltration trenches, infiltration basins, and/or rainwater harvesting must be the water quality SCMs used. Separate SCMs may be used for peak discharge control and water quality treatment. ... ... E. Be designed according to the methodology included in the most current edition of Rainwater and Land Development or another design manual acceptable for use by the City of Youngstown and Ohio EPA.
Full Breakdown
Youngstown does not maintain a standalone rainwater-harvesting ordinance for landscaping; the practice is addressed inside the Comprehensive Stormwater Management chapter's performance standards for developers. Section 950.10(a)(1)B requires that Stormwater Control Measures (SCMs) maintain predevelopment hydrology and groundwater recharge on as much of a development site as practicable, and directs that where feasible, bioretention, permeable pavement with infiltration, underground storage with infiltration, infiltration trenches, infiltration basins, and rainwater harvesting must be the water quality SCMs used, with separate SCMs allowed for peak discharge control versus water quality treatment.
Section 950.10(a)(1)E further requires these SCMs, including rainwater harvesting installations, to be designed according to the methodology in the current edition of Rainwater and Land Development or another design manual acceptable to the City of Youngstown and Ohio EPA. This means a homeowner installing a rain barrel or cistern for ordinary residential landscaping faces no city permit or restriction, but a developer relying on rainwater harvesting to satisfy the Comprehensive Stormwater Management Plan required under Section 950.09 must design it to that manual's standards and have it approved by the City of Youngstown Public Works Department as part of the site's SCM package.
Any SCM approved this way is subject to the chapter's ongoing maintenance and inspection requirements under Sections 950.13 and 950.14, and to Public Works' final say on whether a proposed SCM meets the regulation.
Violations & Fines
Section 950.17 makes it a violation to fail to comply with any provision of the stormwater regulation or with any lawful requirement of a public authority made under it, including requirements tied to an approved rainwater-harvesting SCM, or to use land in violation of a permit granted under the chapter. Violations are enforced under the same notice-and-penalty structure as the rest of Chapter 950.
Frequently Asked Questions
Can I install a rain barrel at my Youngstown home without a permit?
Does Youngstown require developers to use rainwater harvesting?
What design standard applies to a rainwater harvesting SCM in Youngstown?
Sources & Official References
Other rules in Youngstown
Compare Youngstown to another location·View the Ohio landscaping rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.