Skip to main content
CityRuleLookup

Baytown, TX Landscaping Rules: Tree Removal & Heritage Trees (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Tree removal permit rules in Baytown, TX, sometimes called heritage tree, protected tree, or street tree ordinances, list which trees require a permit before you can cut them down.

Key Facts

Governing sections
ULDC Sec. 3.41.I, Sec. 3.43
Removal standard
Planning Director must approve necessity
Root zone protection
75% of critical root zone preserved
Replacement deadline
90 days after death or removal
Scope
New/altered development, not existing homes

Summary

Baytown's ULDC lets a developer remove existing healthy trees only after the Planning Director agrees site constraints require it, and any tree credited toward landscaping requirements that later dies or is removed must be replaced within 90 days.

I. Existing Landscaping and Vegetation. Every effort shall be made to incorporate existing, healthy, mature trees and shrubs into the landscape design. Existing trees and other plants in reasonably healthy condition may be removed only if the owner or developer has satisfactorily demonstrated to the Planning Director that site development constraints necessitate their removal. An evaluation of the existing landscaping proposed to be removed is required. New development shall follow the requirements outlined in 3.43, Tree Preservation.

Sec. 3.43 Tree Preservation. 2. Replacement of Credited Trees. Should any tree for which credit is received under the provisions of this Section die or be removed at any time, the owner shall, within 90 days, replace the tree. The owner shall replace the tree with the number of credited trees (for example, if a 14"-caliper existing tree dies, then the owner shall replace the tree with three new trees).

Full Breakdown

Sec. I, Existing Landscaping and Vegetation, requires every development to make 'every effort' to incorporate existing, healthy, mature trees and shrubs into its landscape design. A healthy existing tree or plant may be removed only if the owner or developer satisfactorily demonstrates to the Planning Director that site development constraints necessitate the removal, and an evaluation of the existing landscaping proposed for removal must be submitted as part of that showing. New development is then routed to Sec. 5 and 6 inches. To keep that credit, Sec.

1 requires a protective barrier around each preserved tree's critical root zone during construction, keeps at least 75 percent of the area under the drip line in a permanent landscaped condition absent Planning Director-approved special provisions, and bars storing soil or materials where it would suffocate root systems. If a credited tree dies or is removed at any time after credit is granted, Sec. 2 requires the owner to replace it within 90 days with the same number of trees the original credit represented (a 14-inch-caliper tree, for example, must be replaced with three new trees of an equivalent species).

This is a development-standard tree preservation program tied to site plans and plats, not a blanket permit requirement for a homeowner cutting down a tree on an existing residential lot.

Violations & Fines

The Planning Director reviews removal justifications and site plans before signing off, so an undocumented removal on an active development site can hold up site plan approval or the certificate of occupancy required under Sec. 3.41.D. Failure to replace a credited tree within the 90-day window under Sec. 3.43.C.2 puts the property out of compliance with the landscaping requirement the credit was applied against, which the Building Official can enforce through the same permit and occupancy process.

Frequently Asked Questions

Does Baytown require a permit to cut down a tree on a private residential lot?
The ULDC's tree provisions in Sec. 3.41.I and Sec. 3.43 attach to new development and site plan review, requiring Planning Director sign-off before an existing tree is removed on a project site; the code does not establish a separate citywide permit for removing a tree on an already-built residential lot.
What happens if a credited tree dies after a Baytown development is built?
Sec. 3.43.C.2 gives the owner 90 days to replace it with the same number of trees the original credit represented, for example replacing one 14-inch-caliper tree with three new trees of an equivalent species.
How much of a preserved tree's root zone must Baytown developers protect?
Sec. 3.43.C.1.c requires at least 75 percent of the area below the drip line, the critical root zone, to remain a permanent landscaped area at existing grade unless the Planning Director approves special protective measures like permeable paving.

Sources & Official References

Other rules in Baytown

All Baytown rules

Texas rules heatmap·Compare Baytown to another location·View the Texas landscaping rules overview

Get notified when Tree Removal & Heritage Trees in Baytown, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Tree Removal & Heritage Trees in Nearby Cities

How other cities in Harris County handle tree removal & heritage trees.

Houston, TX
Some Restrictions