Skip to main content

Arvada, CO Noise from Specific Sources: Generator Noise (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Residential and mixed-use limit
55 dB(A) day, 50 dB(A) night
Commercial limit
60 dB(A) day, 55 dB(A) night
Light industrial limit
70 dB(A) day, 65 dB(A) night
Heavy industrial limit
75 dB(A) day and night
Night hours
9:00 p.m. to 7:00 a.m.
Measurement
At least ten minutes at the property boundary
Tonal or impulsive noise
Five dB(A) below the Table I limit

Summary

Arvada's code never names generators, but a generator is a stationary noise source under § 38-34, so § 38-91 caps its sound at 55 dB(A) by day and 50 dB(A) at night in residential and mixed-use districts, measured for at least ten minutes at the property boundary. Section 38-61 separately bans any excessive or unusually loud noise or noise disturbance anywhere in the city.

It shall be unlawful for any person to make, continue, or cause to be made or continued any excessive or unusually loud noise, or to create a noise disturbance within the limits of the city. (Code 1981, § 19-11; Ord. No. 2208, § 1, 9-16-1985) ... It shall be unlawful for any person to operate or cause or permit to be operated any stationary source of noise which creates a sound pressure level that exceeds the limits set forth in Table I for more than 90 percent of any measurement period. This measurement shall not be less than ten minutes when measured at the property boundary or at any point within the property affected by the noise. TABLE I. SOUND PRESSURE LEVEL LIMIT dB(A) Day Night Use District 7:00 a.m.—9:00 p.m. 9:00 p.m.—7:00 a.m. Residential and mixed-use 55 50 Commercial 60 55 Light industrial 70 65 Heavy industrial 75 75 Noise levels for any PUD shall conform with this table, and shall be determined by the predominant land use as set forth in the PUD plan.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: City Council Policy Manual: Supplement 1 | Code of Ordinances: Supplement 67).

Full Breakdown

Section 38-34 defines a stationary noise source as any equipment or facility, fixed or movable, capable of emitting sound beyond the property boundary of the property on which it is used. A portable job-site unit, a standby unit on a pad and a commercial rooftop set all fit that definition. Once a generator counts as a stationary source, § 38-91 makes it unlawful to run it so that it exceeds the Table I limit for more than 90 percent of any measurement period, and the measurement lasts at least ten minutes.

Table I sets the numbers by use district. Residential and mixed-use land is held to 55 dB(A) from 7:00 a.m. to 9:00 p.m. and 50 dB(A) from 9:00 p.m. to 7:00 a.m. Commercial is 60 by day and 55 at night. Light industrial is 70 and 65. Heavy industrial is 75 around the clock. A planned unit development follows the table according to the predominant land use in its PUD plan. The reading is taken at the property boundary or at any point within the property affected by the noise, so a neighbor's yard counts as a measuring position. When a source is measured in more than one use district, § 38-93 applies the most restrictive district's limit at that district boundary.

Three add-on rules tighten the table. Section 38-94 covers fluctuating or intermittent noise, such as a unit that cycles with load: its tenth percentile level, the level exceeded for six minutes in one hour, cannot run more than 15 dB(A) above the ambient level measured while the source is quiet, and in residential land use categories it can never exceed 70 dB(A). Section 38-95 requires a pure tone, cyclically varying noise or repetitively impulsive noise to come in five dB(A) under the Table I limit, which is 50 dB(A) by day and 45 dB(A) at night in a residential district. Section 38-62(2) bars equipment used in construction activities in residential, commercial or mixed-use districts between 9:00 p.m. and 7:00 a.m.

The exceptions are narrow. Section 38-63 exempts noise caused in the performance of emergency work for the immediate safety, health or welfare of the community. Section 38-65 exempts a property owner's maintenance work done for safety and compliance with the City Code, but only while the noise is reasonable for the work and stays within the § 38-91 levels.

Violations & Fines

Exceeding a Table I limit, or running a generator so that it creates a noise disturbance, is unlawful under §§ 38-61 and 38-91. Chapter 38 sets no dedicated generator fine, so § 38-33 controls: any person convicted of a violation is punished, for each offense, by a fine not to exceed the limits established in § 1-5 of the Arvada City Code. A hardship permit under § 38-35 is the lawful route when a unit cannot meet the numbers.

Frequently Asked Questions

Can I run a generator at night in an Arvada neighborhood?
Only if it stays within the night limit. In a residential or mixed-use district the Table I cap drops from 55 dB(A) to 50 dB(A) between 9:00 p.m. and 7:00 a.m. A unit that whines or hums with a pure tone must come in five dB(A) lower, so 45 dB(A). Section 38-61 also bans any noise disturbance on its own.
How does Arvada measure generator noise?
Section 38-91 requires a measurement of not less than ten minutes, taken at the property boundary or at any point within the property affected by the noise. A violation occurs when the level exceeds the Table I limit for more than 90 percent of the measurement period. Levels are A-weighted dB(A), read on a sound level meter of Type 2 or better under § 38-34.
Does a power outage exempt my backup generator?
Section 38-63 exempts noise caused in the performance of emergency work for the immediate safety, health or welfare of the community, and snow removal and cleanup after weather related events needed to remedy a safety hazard. The code does not list household backup power by name, so a standby unit keeps to the Table I numbers unless the work fits that wording.
What rules apply to a generator on a construction site?
Section 38-62(2) bars equipment used in construction activities in residential, commercial or mixed-use districts between 9:00 p.m. and 7:00 a.m. Construction projects are held to the light industrial maximum, 70 dB(A) by day and 65 dB(A) at night, for the period in which construction is to be completed under the building permit. Construction activities include land clearing, grading, excavating and filling.
Can I get permission to exceed the generator limits?
Yes. Section 38-35 lets a person apply to the city manager or an authorized representative for a permit when prohibiting the noise would cause undue hardship. Relief weighs time of day, duration, loudness relative to the limits, extensiveness, whether the noise is continuous or intermittent, and the feasibility of compliance. A permit can fix dates, times, location, sound pressure level or equipment limits.

Sources & Official References

Other rules in Arvada

All Arvada rules

Compare Arvada to another location·View the Colorado noise from specific sources overview

Get notified when Generator Noise in Arvada, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.