Arvada, CO Building Safety: Electrical Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Adopted code
Most current National Electrical Code edition, per § 18-570
Contractor requirement
City registration plus a valid Colorado electrical contractor's license
Registration fee
No fee to process a registration form
Registration term
Three years or until the state license expires, whichever is sooner
Permit lapse
180 calendar days without starting work or without inspections
Work before permit
Investigation fee plus the required permit fees
Penalty
Fine, imprisonment, or both; each day is a separate offense

Summary

Arvada adopts the most current edition of the National Electrical Code as its electrical code, so the edition in force moves whenever NFPA publishes a new one. Electrical contracting in the city requires registration backed by a valid Colorado state electrical contractor's license, and electrical work needs a permit before it starts. Rough electrical is inspected before rough frame.

Class E Electrical License . This license shall entitle the holder to contract for and perform all work involving electrical systems, wiring, installing, and repairing electrical apparatus and equipment for electric light, heat, and power. To be qualified as an electrical contractor, the person, firm, partnership, co-partnership, association or other organization must hold a valid electrical contractor's license issued by the state according to C.R.S. § 12-115-101 et seq. It shall be the responsibility of the applicant to provide evidence of the state license to the city. ... Registration . It shall be unlawful for any person to engage in electrical contracting in the City of Arvada without being duly registered as provided in this chapter. ... Pursuant to C.R.S. § 31-16-101 et seq. and the Arvada City Charter, the most current edition of the National Electrical Code (NEC), as it becomes published by the National Fire Protection Association and as may be updated from time to time, is hereby adopted as the electrical code of the City of Arvada.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: City Council Policy Manual: Supplement 1 | Code of Ordinances: Supplement 67).

Full Breakdown

Section 18-570 adopts the National Electrical Code under C.R.S. § 31-16-101 et seq. and the Arvada City Charter. The wording is open-ended: it takes the most current edition as the National Fire Protection Association publishes it, with no fixed edition year in the section. Section 18-2 backs this up by providing that whenever a technical code references the ICC Electrical Code, the reference means the National Electrical Code most recently adopted by Arvada.

Who can do the work is set by section 18-74. The Class E Electrical License covers all work on electrical systems, wiring, and apparatus for electric light, heat, and power. An applicant must hold a valid electrical contractor's license from the State of Colorado under C.R.S. § 12-115-101 et seq. and must give the city evidence of it. Section 18-74(b) then makes it unlawful to engage in electrical contracting in Arvada without being registered. The Building Safety Division furnishes the registration forms, and no fee is charged to process a registration form. Under section 18-75(a), an electrical registration expires three years from the date of issue or on the expiration date of the state license, whichever is sooner, and an expired registration must be renewed before work in progress is continued or completed.

Other trades cannot stand in for an electrician. The Class D subcontractor license does not authorize any electrical work, and a Class M mechanical contractor must use a city-registered electrical contractor for line voltage electrical work. A registered professional engineer who only plans or designs an electrical installation is not classified as an electrical contractor under the section 18-2 definition. An owner-occupant does not need a contractor's license to work at the owner's own home, but section 18-71(a)(1) requires a permit whenever one is required, and the work must still follow the Code.

Permits and inspections run through the same chapter. Section 18-39(a)(3) makes it unlawful to alter, repair, equip, or maintain a building or structure without first obtaining a required permit. A permit expires if work is not commenced within 180 calendar days or is suspended or abandoned for 180 calendar days under section 18-39(f). The permit holder must post the property so the address is clearly visible from the street before work starts (§ 18-43). For houses built under the International Residential Code, section 18-173 requires a rough mechanical, electrical, and plumbing inspection before the rough frame inspection.

Violations & Fines

Engaging in electrical contracting without registration, starting electrical work without a permit, and using unsafe equipment are all unlawful under section 18-39(a). A conviction carries a fine, imprisonment, or both, up to the limits in section 1-5 of the Arvada City Code, and each day a violation continues is a separate offense. Prosecution begins with a summons and complaint in municipal court under chapter 58. Starting without a permit also adds an investigation fee on top of the permit fees under section 18-42(e). Denial, suspension, or revocation of a license or permit does not count as a penalty, so it can be imposed in addition to a fine.

Frequently Asked Questions

Which edition of the National Electrical Code does Arvada enforce?
Section 18-570 adopts the most current edition of the National Electrical Code as the National Fire Protection Association publishes it and as it is updated from time to time. The section names no edition year, so the edition the Building Safety Division enforces follows NFPA's latest publication rather than a date fixed in the ordinance.
Can I wire my own house in Arvada?
An owner-occupant does not need a contractor's license for work at the owner's own home under section 18-71(a)(1), but must secure a permit when one is required, and the work must follow the Code. Hiring someone for a fee to do the wiring means that person must be a registered electrical contractor.
What does an electrical contractor need to register with Arvada?
Section 18-74(b) requires a valid electrical contractor's license from the State of Colorado under C.R.S. § 12-115-101 et seq., and the applicant must give the city evidence of it. Registration goes on forms from the Building Safety Division with no processing fee, and it expires after three years or when the state license expires, whichever is sooner.
What happens if electrical work starts before the permit is issued?
Section 18-42(e) charges an investigation fee in addition to the required permit fees. The exception covers emergency work shown to the building official to be urgently necessary: notify the Building Safety Division by telephone or facsimile before the end of the next working business day and submit a permit application within one week.
Can a general or mechanical contractor do the electrical part of a job?
No. Section 18-74(a)(4) says the Class D subcontractor license does not authorize any electrical work, and section 18-74(a)(7) requires that line voltage electrical work for a mechanical contractor be done by a city-registered electrical contractor. Where several trades are involved, section 18-2 calls for a combination permit issued to the general contractor.

Sources & Official References

Other rules in Arvada

All Arvada rules

Compare Arvada to another location·View the Colorado building safety overview

Get notified when Electrical Permits in Arvada, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Jefferson County handle electrical permits.

Lakewood, CO
Some Restrictions