Sheboygan, WI Parking Rules: Driveway Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Plan approval
Department of engineering and public works, before work begins
Plan commission review
Over 30 linear feet of curbing, parking lots, commercial or industrial uses
Appeal
Written appeal to the common council within ten days
Surface
Portland cement concrete or asphaltic concrete on paved streets
Paving deadline
Within one year of the street being paved
Drainage device deadline
Within one month of building permit issuance

Summary

In Sheboygan, anyone who builds a driveway or rolling curb connecting to a public street or alley must submit plans to the department of engineering and public works for approval before work starts. A driveway on a paved street must be permanently improved with Portland cement concrete or asphaltic concrete within one year of the street being paved.

(a) Any person desiring to construct or install a rolling curb or driveway connecting with a public street or alley or any person desiring to use an existing street with a roll-back curb as a driveway shall, before the commencement of such work or utilization of such street, submit plans therefor to the department of engineering and public works for approval. ... (b) A driveway abutting on a street that is paved shall be permanently improved with Portland cement concrete or asphaltic concrete of a thickness and density sufficient to carry the anticipated superimposed load within one year of the street being paved. ... (d) Driveway interfering with drainage. No person shall construct a driveway which in any manner adversely affects the drainage or flow of surface water or stormwater.

Full Breakdown

Division 4 of Chapter 110 of the Sheboygan Municipal Code governs driveways that connect to public streets and alleys. Section 110-141(a) requires any person who wants to construct or install a rolling curb or driveway connecting with a public street or alley, or to use an existing street with a roll-back curb as a driveway, to submit plans to the department of engineering and public works for approval before the work or use begins.

Larger projects go to the city plan commission. Under section 110-141(b), approval must come from the commission where the work involves an excess of 30 linear feet of any type curbing, including roll-back curbing, or is made in connection with a parking lot or a commercial or industrial establishment. The commission can approve, conditionally approve or deny, and it weighs distances from intersections, the location and number of existing driveway openings nearby, the effect on traffic capacity, undue congestion or other traffic hazards, and the impact on adjacent properties. Section 110-141(c) lets the applicant or other interested parties appeal to the common council by filing a written appeal with the city clerk within ten days of the commission's decision, and that appeal stays all action until the council reaffirms, modifies or reverses.

Surface rules are in section 110-143. Where the driveway abuts a paved street, it must be built with either Portland cement concrete or asphaltic concrete of a thickness and density sufficient to carry the anticipated superimposed load, and it must be permanently improved that way within one year of the street being paved. Section 110-142 conditions any approval for a driveway, rolling curb or parking apron on the owner agreeing to restore the adjacent sidewalks and curbs when the driveway use ends or the council orders restoration.

Drainage is covered by section 110-144. A culvert, pipe, conduit or other drainage device approved by the city planner must be installed at each driveway on a lot abutting a street not paved with Portland cement concrete, and the building permit is revoked and construction stopped if it is not installed within one month of the permit date. No driveway can adversely affect the drainage or flow of surface water or stormwater. Separately, section 118-138 bars parking a vehicle on the grass on public property unless an authorized city official directs otherwise.

Violations & Fines

Section 110-1 lists none of sections 110-141 through 110-144 with a specific forfeiture, so the general penalty in section 1-12(a) applies where no specific penalty is provided: a forfeiture of not less than $50.00 nor more than $500.00 plus costs of prosecution, with imprisonment of up to 90 days in default of payment. Each day is a separate offense under section 1-12(b), and under section 110-144(b) the building permit is revoked if the required drainage device is missing after one month.

Frequently Asked Questions

Do I need city approval to add a driveway in Sheboygan?
Yes. Section 110-141(a) requires plans for any driveway or rolling curb connecting with a public street or alley to go to the department of engineering and public works for approval before work begins. Projects over 30 linear feet of curbing, or tied to a parking lot or commercial or industrial establishment, need plan commission approval.
What material must a Sheboygan driveway be made of?
Where the driveway abuts a paved street, section 110-143 requires Portland cement concrete or asphaltic concrete of a thickness and density sufficient to carry the anticipated superimposed load. The driveway must be permanently improved that way within one year of the street being paved.
How do I appeal a plan commission decision on a driveway?
Under section 110-141(c), the applicant or other interested parties file a written appeal with the city clerk within ten days of the commission's decision. The appeal stays all action until the common council reviews it and either reaffirms, modifies or reverses the commission's decision.
Can a driveway change how water drains in Sheboygan?
No. Section 110-144(d) says no person shall construct a driveway which in any manner adversely affects the drainage or flow of surface water or stormwater. Section 110-144(c) separately bars damaging or modifying any ditch, culvert or pipe in a public right-of-way or easement without written permission from the director of engineering and public works.

Sources & Official References

Other rules in Sheboygan

All Sheboygan rules

Compare Sheboygan to another location·View the Wisconsin parking rules overview

Get notified when Driveway Rules in Sheboygan, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.