Skip to main content
CityRuleLookup

El Monte, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

New residential enclosed spaces
Must be EV-capable
10+ unit multifamily
15% of guest spaces or 2, greater
10-25 total spaces
4 EV-capable required
76-100 total spaces
18 EV-capable required
Installed stations
Half of capable spaces must be installed

Summary

El Monte requires new construction to provide electric vehicle charging capacity under Municipal Code 17.70.090. Single-family and multifamily projects must pre-wire new enclosed parking spaces to be EV-capable, multifamily projects with 10 or more units must install charging stations for at least 15 percent of guest spaces, and nonresidential projects scale up from a table tied to total parking count.

A.Residential Thresholds...1.Single-Family or Multiple-Family Residential Construction. Any new enclosed parking spaces shall be EV-capable, pre-equipped for electric vehicle (EV) charging units.2.Multiple-Family Residential Construction with Ten (10) or More Units. Provide electrical charging stations at a rate of fifteen (15) percent of the required guest parking spaces, or two (2) spaces, whichever is greater.B.Nonresidential Thresholds...3.Existing Parking Lots...EV charging spaces shall not be required if the parking lot is only being resurfaced (i.e. slurry seal or seal coat) and/or being restriped.C.Number of Spaces. Table 17.70-11 prescribes the required number of capable and installed EV charging spaces and stations.

Full Breakdown

090, Electric Vehicle Charging Spaces/Stations, sets minimum EV-readiness thresholds by project type in Title 17 (Zoning). For residential construction, every new enclosed parking space in a single-family or multifamily project must be EV-capable, meaning pre-equipped for a Level 1 charging unit at minimum. Multifamily projects with 10 or more units go further, requiring installed electrical charging stations at a rate of 15 percent of required guest parking spaces or 2 spaces, whichever is greater. 70-11 and scaled to the project's total required parking: a lot with 10 to 25 spaces needs 4 EV-capable spaces, climbing to 8 for 26 to 50 spaces, 14 for 51 to 75, 18 for 76 to 100, 26 for 101 to 150 and 36 for 151 to 200.

Lots under 10 total spaces require no capable spaces, but where capable spaces are required, half of them must be installed charging stations complete with EV supply equipment. The requirement follows the trigger for the project itself: new projects size against total required parking, building expansions size against only the new parking added, and a full parking-lot reconstruction sizes against the whole lot, but resurfacing or restriping alone never triggers the requirement. For projects needing 10 or more spaces, the code allows converting 2 Level 1 or 2 stations for each Level 3 fast-charging station installed instead.

EV space and charging-station counts round up to the nearest whole number rather than down, an exception carved out from the code's general rounding rule.

Violations & Fines

A residential project that fails to pre-wire new enclosed parking as EV-capable, or a qualifying multifamily or nonresidential project that omits the installed charging stations Table 17.70-11 requires, is out of compliance with Section 17.70.090 and won't clear Planning Division plan check or receive a certificate of occupancy until the wiring or stations are added. Existing parking lots that are fully reconstructed but skip the EV retrofit are likewise subject to correction before final approval.

Frequently Asked Questions

Does my new El Monte apartment building need EV charging stations?
If it has 10 or more units, yes. Section 17.70.090(A)(2) requires installed electrical charging stations at 15 percent of the required guest parking spaces or 2 spaces, whichever is greater, on top of the requirement that every new enclosed space be EV-capable.
How many EV spaces does a new commercial building need in El Monte?
It depends on total required parking under Table 17.70-11: a project needing 10 to 25 spaces must provide 4 EV-capable spaces, scaling up to 36 EV-capable spaces for a project needing 151 to 200 total spaces, with half of the capable spaces required to be fully installed charging stations.
Does resurfacing my parking lot trigger El Monte's EV charging requirement?
No. Section 17.70.090(B)(3) specifically exempts parking lots that are only being resurfaced, such as slurry seal or seal coat work, or restriped, from the EV charging space requirements that apply to full lot reconstruction.

Sources & Official References

Other rules in El Monte

All El Monte rules

California rules heatmap·Compare El Monte to another location·View the California parking rules overview

Get notified when EV Charging in El Monte, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Los Angeles County handle ev charging.

South Gate, CA
Light Restrictions
Santa Clarita, CA
Light Restrictions
Santa Monica, CA
Some Restrictions
Downey, CA
Some Restrictions
Los Angeles, CA
Some Restrictions
Carson, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Palmdale, CA
Some Restrictions