Fullerton, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Home Charger Permit
Electrical permit required (streamlined)
New Construction
EV-ready wiring required (CALGreen)
HOA Limits
Cannot unreasonably restrict (CC §4745)
Sidewalk Cables
Prohibited across public walkways
Permits
Building Division, (714) 738-6837

Summary

Fullerton follows California requirements for EV charging infrastructure. The city streamlines permits for residential Level 2 charger installations and new construction must include EV-ready parking per CALGreen Code requirements.

(b) A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building official's review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.

(c) A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.

(d) The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.

(e) Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.

Source: California AB 1236 — EV Charging PermitsView official code

Full Breakdown

Under California AB 1236 and AB 2188, Fullerton must provide streamlined, expedited permitting for residential EV charging station installations. A standard Level 2 (240V) home charger installation typically requires an electrical permit from the Building Division. The CALGreen Building Code (Title 24 Part 11) requires new residential construction to include EV-ready wiring in garages. For multi-family buildings, a percentage of parking spaces must be EV-capable. The city has public EV charging stations at various locations including the downtown parking structure and city facilities. Running charging cables across public sidewalks is prohibited. HOAs cannot unreasonably restrict EV charger installation under California Civil Code Section 4745. The Building Division at (714) 738-6837 handles EV charger permits.

Violations & Fines

Installing an EV charger without an electrical permit may result in code violations and fines. Unpermitted electrical work may void insurance coverage and create safety hazards.

Frequently Asked Questions

Do I need a permit to install an EV charger at home in Fullerton?
Yes. A Level 2 charger installation requires an electrical permit from the Building Division, but the process is streamlined under California AB 1236.
Can my HOA block me from installing an EV charger in Fullerton?
No. Under California Civil Code Section 4745, HOAs cannot unreasonably restrict EV charging station installations in homeowner parking areas.
Does new construction in Fullerton need EV charging capability?
Yes. The CALGreen Building Code requires new residential construction to include EV-ready wiring in garages and designated parking areas.

Sources & Official References

Other rules in Fullerton

All Fullerton rules

California rules heatmap·Compare Fullerton to another location·View the California parking rules overview

Get notified when EV Charging in Fullerton, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Orange County handle ev charging.

Newport Beach, CA
Light Restrictions
Irvine, CA
Light Restrictions
Mission Viejo, CA
Some Restrictions
Santa Ana, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Garden Grove, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions
Orange, CA
Some Restrictions