Margate, FL Parking Rules: EV Charging (2026)
Key Facts
- Trigger
- New parking area, new or changed use, or substantial modification
- Reviewer
- Development Services Department and Development Review Committee
- EV charging item
- Listed in master parking plan when applicable to the property
- Plan preparer
- Professional engineer licensed in Florida
- Fuel station separation
- 1,000 feet between stations (§ 40.613(B))
- Lot minimum for fuel stations
- 100 feet wide, 125 feet deep
Summary
In the City of Margate, Florida, a master parking plan for a new or substantially modified parking area must show electric vehicle charging stations when they apply to the property. The plan goes to Development Services and the Development Review Committee and is prepared by a Florida-licensed professional engineer.
c.For all other uses or improvements described in Paragraph (1), above, a master parking plan shall be submitted by the property owner to the Development Services Department for review and approval by the Development Review Committee (DRC). The plan shall clearly and accurately designate off-street parking spaces, landscape areas, pedestrian access, bicycle parking facilities, parking for disabled people, pedestrian drop off and pick-up areas, dumpster locations, loading zones, all truck turning movements, drainage, lighting, access aisles, driveways, and the relation to the uses or structures these off-street parking facilities are intended to serve as appropriate. If applicable to the subject property or properties, the following parking area features shall be included in the master parking plan: electric vehicle charging stations, fuel pumps, valet parking, vehicle gates, vehicle reservoir areas (queueing), ... reserved parking spaces, hydrants, freestanding signs, and all other accessory structures within the parking area.
Full Breakdown
Margate does not set an EV-ready space count in the section on charging. Instead, § 40.705(H) of the Land Development Code requires a master parking plan before any building or engineering permit issues for a new parking area, a new use or change of use, or a substantial modification such as altered vehicle circulation or an expansion or reduction of the parking area. For projects other than single-family or duplex housing, the property owner submits the plan to the Development Services Department for review and approval by the Development Review Committee.
The plan must designate off-street parking spaces, landscape areas, pedestrian access, bicycle parking, disabled parking, drop-off and pick-up areas, dumpsters, loading zones, truck turning movements, drainage, lighting, access aisles and driveways. If applicable to the property, the plan must also show electric vehicle charging stations, fuel pumps, valet parking, vehicle gates, queueing areas, short-term pick-up parking, curbside restaurant spaces, reserved spaces, hydrants, freestanding signs and other accessory structures. The plan must be prepared by a professional engineer licensed in Florida and include a detailed parking calculation.
Separately, § 40.613(A) applies its vehicle fueling station regulations to facilities that dispense automobile fuel, contain vehicle charging stations, oil, or lubricants to the general public. Those regulations include a 1,000-foot separation between stations, 100 feet from any residential use, a minimum lot of 100 by 125 feet, canopy setbacks of 25 feet from the right-of-way, and 25 per cent landscaped or pervious area. Section 40.613(G) also bars lighting that causes direct glare onto an adjacent right-of-way or property. In the B-3 district, a vehicle fuel station is a special exception governed by § 40.613.
Violations & Fines
A violation of the Margate Code is an offense against the city under § 1-8, punishable by a fine not to exceed $500.00 and a jail term not to exceed 60 days, with each act counted as a separate violation. Because the master parking plan is a precondition, no building or engineering permit for the affected parking area issues until the plan is submitted and approved.
Frequently Asked Questions
Does Margate require EV charging stations in new parking lots?
Who reviews a Margate master parking plan showing EV chargers?
Do EV charging facilities fall under Margate's fueling station rules?
Is a master parking plan needed for a single-family home in Margate?
Sources & Official References
Other rules in Margate
Florida rules heatmap·Compare Margate to another location·View the Florida parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
EV Charging in Nearby Cities
How other cities in Broward County handle ev charging.