Skip to main content
CityRuleLookup

Mount Vernon, NY Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger threshold
Parking lots with more than 150 spaces
Required EV spaces
At least two per qualifying lot
Applies in
MVW Transit-Oriented Development District only
Governing law
City of Mount Vernon Code Section 267-19
Reviewing body
Planning Board site plan approval
Related standard
General parking design rules, Section 267-38

Summary

In Mount Vernon's MVW Transit-Oriented Development District near the Mount Vernon West train station, any parking lot with more than 150 spaces must include at least two electric vehicle charging stations, under the zoning code's off-street parking design standards for that district in Westchester County, New York.

In each parking lot containing over 150 parking spaces, at least two of the parking spaces must be provided with an electric vehicle charging station.

Full Breakdown

Mount Vernon's zoning code, adopted as a form-based code for the Mount Vernon West Transit-Oriented Development Zone, sets a targeted electric-vehicle charging mandate rather than a citywide one. City of Mount Vernon Code Section 267-19 governs the MVW District, an area built around the Metro-North Mount Vernon West station in Westchester County, New York, and its Design and layout provisions for off-street parking state that any parking lot in the district holding more than 150 spaces must set aside at least two spaces for electric vehicle charging stations.

The requirement sits inside a broader package of design-and-layout rules that apply on top of the citywide off-street parking design standards in Section 267-38: shared driveways are encouraged to cut down curb cuts on Mount Vernon Avenue, Grove Street and Oak Street; off-street parking must be screened and landscaped; and parking structures fronting MacQuesten Avenue and Mount Vernon Avenue must be wrapped with ground-floor nonresidential uses. Because the MVW District operates on a park once model built around the train station, base parking ratios are already reduced under Section 267-19(8), and the electric vehicle spaces are layered onto whatever base parking count the project ultimately builds.

The rule applies at the site-plan stage: projects in the MVW District go through one of three review tracks, no-review, expedited review, or standard review, run by the Department of Planning and Community Development, the Planning Board and the Architectural Review Board, and layout compliance including the EV spaces is checked as part of that site plan approval before a building permit issues. There is no exemption for phased or shared-parking facilities; a shared-parking arrangement can supply up to half a project's required spaces but does not waive the two-space electric vehicle threshold once a lot exceeds 150 spaces.

Violations & Fines

There is no separate citation or fine schedule for missing EV spaces because the rule is enforced through site plan approval rather than after-the-fact ticketing. The Planning Board, or on expedited-review projects the City Council and Architectural Review Board, will not approve a site plan for a covered MVW District parking lot that omits the two required electric vehicle charging spaces, and the Department of Buildings will not issue a certificate of occupancy for a project built without them.

Frequently Asked Questions

Does every parking lot in Mount Vernon need EV charging spaces?
No. The requirement in City of Mount Vernon Code Section 267-19 applies only within the MVW Transit-Oriented Development District near the Mount Vernon West train station, and only to lots exceeding 150 spaces. Smaller lots and parking outside the MVW District are not subject to this mandate, though the general off-street parking design provisions of Section 267-38 still apply.
How many EV charging spaces are required?
At least two. City of Mount Vernon Code Section 267-19 requires any parking lot containing more than 150 spaces within the MVW District to provide a minimum of two spaces equipped with electric vehicle charging stations, on top of complying with the district's other design and layout standards for off-street parking.
Who checks compliance with this requirement?
Site plan applications in the MVW District go before Mount Vernon's Planning Board, or for expedited-review projects the City Council and Architectural Review Board, which confirm off-street parking layouts, including the required electric vehicle charging spaces, meet Section 267-19's design and layout standards before approving construction.

Sources & Official References

Other rules in Mount Vernon

All Mount Vernon rules

New York rules heatmap·Compare Mount Vernon to another location·View the New York parking rules overview

Get notified when EV Charging in Mount Vernon, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Westchester County handle ev charging.

Yonkers, NY
Some Restrictions
New Rochelle, NY
Some Restrictions