Redding, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

State Standard
CALGreen §4.106.4 / §A4.106.8 + §5.106.5.3
New 1-Family Home
EV-ready 40A 208/240V branch circuit
Local Code
RMC Title 16 (adopted CBSC + CALGreen)
HOA Protection
California Civil Code §4745
EV-Only Space Enforcement
CVC §22511
Home Charger Permit
Redding Development Services (777 Cypress)

Summary

Redding adopts the California Building Standards Code and the California Green Building Standards Code (CALGreen) under Redding Municipal Code Title 16. New one- and two-family residences must install at least one EV-ready parking space (40-amp, 208/240-volt branch circuit) under CALGreen §A4.106.8 / §4.106.4 as adopted in California. Installation of Level 2 home chargers requires an electrical permit through Redding Development Services. HOAs cannot prohibit owner EVSE under California Civil Code §4745.

AB 1236, Chiu. Local ordinances: electric vehicle charging stations... The bill would require a city, county, or city and county to approve an application for the installation of electric vehicle charging stations, as defined, through the issuance of specified permits unless the city or county makes specified written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The bill would provide for appeal of that decision to the planning commission, as specified...

Full Breakdown

Redding's EV-charging framework runs through three layers. 3 (nonresidential / multifamily) require new one- and two-family dwellings and townhouses to install at least one EV-ready parking space with a 40-amp, 208/240-volt branch circuit terminating at the future charger location, and require percentages of EV-capable, EV-ready, and EV-charging-station spaces in multifamily and nonresidential lots that scale up with each code cycle. The 2025 CALGreen cycle (effective Jan 1, 2026) further increases multifamily requirements. (2) Local adoption: Redding Municipal Code Title 16 (Buildings and Construction) adopts the California Building Standards Code including CALGreen, with installation permitted through Redding Development Services at 777 Cypress Avenue.

Level 2 (240V) home chargers, sub-panels, and dedicated branch circuits require an electrical permit and a licensed electrician. (3) State EV-space protection / HOA law: California Vehicle Code §22511 reserves posted EV-charging spaces for vehicles actively charging, non-EVs and EVs not actively charging may be cited. 1 extends similar protection to EV-dedicated TOU panels. 6.

Violations & Fines

New residential or commercial construction in Redding that fails to install the CALGreen-required EV-capable, EV-ready, or EV-charging-station spaces cannot pass final building inspection. Installing a Level 2 home charger, sub-panel, or dedicated branch circuit without an electrical permit is a building-code violation enforceable by Redding Development Services with stop-work orders and corrective-permit requirements. Parking a non-EV in a posted EV-charging space, or an EV that is not actively charging, is citable under California Vehicle Code §22511. HOAs that violate Civil Code §4745 by denying owner EVSE installations face civil liability including attorney's fees.

Frequently Asked Questions

Does a new Redding home need EV charging?
Yes. The California Green Building Standards Code §4.106.4 (with optional §A4.106.8 enhancements), adopted by Redding Municipal Code Title 16, requires every new one- and two-family dwelling and townhouse to install at least one EV-ready parking space with a 40-amp, 208/240-volt branch circuit terminating in a junction box or NEMA 14-50 receptacle at the future charger location. New multifamily and commercial projects must include a percentage of EV-capable, EV-ready, and EV-charging-station spaces under §5.106.5.3.
Do I need a permit to install a Level 2 EV charger at my Redding home?
Yes. An electrical permit is required to install a 240-volt (Level 2) home EV charger, dedicated branch circuit, or sub-panel upgrade. Apply through Redding Development Services at 777 Cypress Avenue. A licensed C-10 electrician typically pulls the permit, and a final inspection is required before energization.
Can my Redding HOA stop me from installing an EV charger?
No, not in your exclusive-use parking area. California Civil Code §4745 prohibits common interest development governing documents from effectively prohibiting or unreasonably restricting the installation or use of an EV charging station within an owner's designated parking space. The HOA may impose reasonable conditions (insurance, professional installation, metering) but cannot deny a code-compliant installation.

Sources & Official References

Other rules in Redding

All Redding rules

California rules heatmap·Compare Redding to another location·View the California parking rules overview

Get notified when EV Charging in Redding, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.